Difference between revisions of "July 29, 2010 Readout"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 35: | Line 35: | ||
= Minutes = | = Minutes = | ||
Attendees: | Attendees: | ||
+ | |||
+ | = Tentative Agenda = | ||
+ | |||
+ | # Announcements | ||
+ | # Review of Action Items | ||
+ | # Bcal thresholds and resolution at low energies ([http://dustbunny.physics.indiana.edu/~mashephe/bcal_dkrate.pdf PDF Slides]) (Matt) | ||
+ | # [[SiPM Radiation Hardness Test]] (Update from Yi) | ||
+ | # Geometry | ||
+ | # [http://www.jlab.org/~huttonc/gluing.pptx Light Guide Gluing] (Chuck) | ||
+ | # [http://www.jlab.org/~huttonc/HAMSEAT.pptx SiPM positioning] (Chuck) | ||
+ | # Update - USM | ||
+ | #* Status of statement of work (SOW) | ||
+ | # Simulation runs | ||
+ | # Cosmic-ray setup at UofR | ||
+ | # Light guides |
Revision as of 13:41, 29 July 2010
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone in CC L207 is 757-269-7084
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.
Contents
Items for followup from previous meeting
- Testing goals and setup (Serguei)
- Will to find out if there is any feedback from USM on terms and conditions from our procurement package.
- Will to update statement of work for USM contract and develop detailed schedule.
- Collect this information of testing on the wiki for ease of presenting information. (USM)
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- Bcal thresholds and resolution at low energies (PDF Slides) (Matt)
- SiPM Radiation Hardness Test (Update from Yi)
- Geometry
- Light Guide Gluing (Chuck)
- SiPM positioning (Chuck)
- Update - USM
- Status of statement of work (SOW)
- Simulation runs
- Cosmic-ray setup at UofR
- Light guides
Minutes
Attendees:
Tentative Agenda
- Announcements
- Review of Action Items
- Bcal thresholds and resolution at low energies (PDF Slides) (Matt)
- SiPM Radiation Hardness Test (Update from Yi)
- Geometry
- Light Guide Gluing (Chuck)
- SiPM positioning (Chuck)
- Update - USM
- Status of statement of work (SOW)
- Simulation runs
- Cosmic-ray setup at UofR
- Light guides