Difference between revisions of "July 5, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Action Items from previous meetings == # Develop front and back views of jumper sheets. Also get latest version of drawings (Jack) # Check into AC units based on Peltier cool...")
 
(Action Items from previous meetings)
Line 1: Line 1:
 
== Action Items from previous meetings ==
 
== Action Items from previous meetings ==
  
# Develop front and back views of jumper sheets. Also get latest version of drawings (Jack)
+
# Develop front and back views of jumper sheets. (Jack)
 
# Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
 
# Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
 
# Design tooling/procedure for making the patterns for wrapping from tedlar (Jim)
 
# Design tooling/procedure for making the patterns for wrapping from tedlar (Jim)

Revision as of 17:15, 21 June 2012

Action Items from previous meetings

  1. Develop front and back views of jumper sheets. (Jack)
  2. Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
  3. Design tooling/procedure for making the patterns for wrapping from tedlar (Jim)
  4. Review Fcal LED and controller monitoring boards (Fernando)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. Beam test experience (Elton)
  5. SiPM production testing (everyone)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Chris)
  11. Light guide gluing setup

Minutes

Attending: