Difference between revisions of "July 5, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Action Items from previous meetings)
Line 4: Line 4:
 
# Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
 
# Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
 
# Review Fcal LED and controller monitoring boards (Fernando)
 
# Review Fcal LED and controller monitoring boards (Fernando)
 +
# Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 17:26, 21 June 2012

Action Items from previous meetings

  1. Develop front and back views of jumper sheets. (Jack)
  2. Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
  3. Review Fcal LED and controller monitoring boards (Fernando)
  4. Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. Beam test experience (Elton)
  5. SiPM production testing (everyone)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Chris)
  11. Light guide gluing setup

Minutes

Attending: