Difference between revisions of "July 5, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 21: Line 21:
  
 
== Minutes ==
 
== Minutes ==
''Attending:
+
''Attending:Jack, Nick, Chris, Elton, Jim
 +
 
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
# SiPM production testing (everyone)
 +
#* SiPMs assignment for new boards
 +
# Mechanical assembly (Scot)
 +
# Mechanical (Jim)
 +
# Mechanical drawings (Chuck)
 +
# Temperature compensation (Jack)
 +
# Preamp-summing (Chris)
 +
# Light guide gluing setup

Revision as of 15:52, 5 July 2012

Action Items from previous meetings

  1. Develop front and back views of jumper sheets. (Jack)
  2. Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
  3. Review Fcal LED and controller monitoring boards (Fernando)
  4. Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Scot)
  6. Mechanical (Jim)
  7. Mechanical drawings (Chuck)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Chris)
  10. Light guide gluing setup

Minutes

Attending:Jack, Nick, Chris, Elton, Jim

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Scot)
  6. Mechanical (Jim)
  7. Mechanical drawings (Chuck)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Chris)
  10. Light guide gluing setup