Difference between revisions of "July 7, 2008 Calorimetry"
From GlueXWiki
(→Agenda) |
|||
Line 23: | Line 23: | ||
# Preparations for Lehman Review | # Preparations for Lehman Review | ||
#* Reconstruction work | #* Reconstruction work | ||
+ | #** [[Media:bcal_4x6.pdf| BCAL 4x6 readout]] | ||
+ | #** [[Media:bcal_3x3.pdf| BCAL 3x3 readout]] | ||
+ | #** [[Media:det_cabling.pdf| BCAL, CDC, FDC cables]] | ||
+ | #** [[Media:bcal_cdc_gap.pdf| Gap between BCAL and CDC]] | ||
#* [[Alternative readout]] | #* [[Alternative readout]] | ||
## Review of Action-Item Tracker for Calorimetry | ## Review of Action-Item Tracker for Calorimetry |
Revision as of 18:49, 2 July 2008
Connection
- The meeting will be held at 10:30 am ET
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Reference Documents
- Previous minutes: June 23, 2008 Calorimetry
- Schedule, Tracker and Drawings (gluex pass)
- Schedule
Agenda
- Updates
- Calibration system
- FCAL
- BCAL
- SiPM
- Preparations for Lehman Review
- Reconstruction work
- Alternative readout
- Review of Action-Item Tracker for Calorimetry
- Any other business
Minutes
Participants: