Difference between revisions of "July 7, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
(Agenda)
Line 23: Line 23:
 
# Preparations for Lehman Review
 
# Preparations for Lehman Review
 
#* Reconstruction work
 
#* Reconstruction work
 +
#** [[Media:bcal_4x6.pdf| BCAL 4x6 readout]]
 +
#** [[Media:bcal_3x3.pdf| BCAL 3x3 readout]]
 +
#** [[Media:det_cabling.pdf| BCAL, CDC, FDC cables]]
 +
#** [[Media:bcal_cdc_gap.pdf| Gap between BCAL and CDC]]
 
#* [[Alternative readout]]
 
#* [[Alternative readout]]
 
## Review of Action-Item Tracker for Calorimetry
 
## Review of Action-Item Tracker for Calorimetry

Revision as of 18:49, 2 July 2008

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: June 23, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)
  3. Schedule

Agenda

  1. Updates
    • Calibration system
    • FCAL
    • BCAL
      • SiPM
  2. Preparations for Lehman Review
    1. Review of Action-Item Tracker for Calorimetry
  3. Any other business

Minutes

Participants: