Difference between revisions of "June 11, 2009 Calorimetry"
From GlueXWiki
(→Items for followup from previous meeting(s)) |
(→Items for followup from previous meeting(s)) |
||
Line 9: | Line 9: | ||
=Items for followup from previous meeting(s)= | =Items for followup from previous meeting(s)= | ||
− | # Resolution studies | + | # Resolution studies |
#* Develop criteria for evaluating resolution studies | #* Develop criteria for evaluating resolution studies | ||
#* Study impact of inactive material at the end of BCAL on acceptance. | #* Study impact of inactive material at the end of BCAL on acceptance. | ||
Line 15: | Line 15: | ||
# Review calibration procedures | # Review calibration procedures | ||
# Will: Noted from CLAS experience both oxides and carbonates can accumulate on lead. One type is worse than the other (will send references to UofR) | # Will: Noted from CLAS experience both oxides and carbonates can accumulate on lead. One type is worse than the other (will send references to UofR) | ||
− | # | + | # <strike> Elton will check on fiber delivery and comments from Kuraray on material for storage of fibers.</strike> |
= Documents to Review= | = Documents to Review= |
Revision as of 08:52, 10 June 2009
Teleconference Time: 11:00 a.m. EST
- EVO session
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from previous meeting(s)
- Resolution studies
- Develop criteria for evaluating resolution studies
- Study impact of inactive material at the end of BCAL on acceptance.
- Documentation on fiber first-article
- Review calibration procedures
- Will: Noted from CLAS experience both oxides and carbonates can accumulate on lead. One type is worse than the other (will send references to UofR)
-
Elton will check on fiber delivery and comments from Kuraray on material for storage of fibers.
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration
- FCAL Update
- Simulations
- BCAL Fabrication
- Contract (George)
- Preparations for construction (Zisis)
- Report on First-article fibers (Zisis)
- March: Kuraray Fibre Tests - March 19, 2009
- This week: Media:FiberAtten-20090528.pdf
- BCAL Readout
- Update from USM (Will)
- Readout specifications using SiPMs (Fernando)
- Rates in the BCAL [1] (Sasha) and Beni
- Light guide efficiency for FM PMTs (GlueX-doc-1279 pp 12-19) (Elton)
- Review of readout options (tentative July 14) discussion