Difference between revisions of "June 23, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
(Minutes)
Line 28: Line 28:
  
 
=Minutes=
 
=Minutes=
Participants:
+
Participants: Zisis, Andrei, George, Elton, Elke, Beni, Tim, Matt. <br>
 +
 
 +
* Note: Here are some brief to-do-list based on the summary discussion. (Elton).
 +
 
 +
* Given the limited manpower and time, we decided to come up with a conceptual design based on wire-mesh pmts as an "alternative" backup for the Lehman Review.
 +
 
 +
* Homework
 +
** Review segmentation requirements, especially for inner calorimeter (Zisis report on work to date)
 +
** Clarify geometry in current files (Beni)
 +
** Assess impact of material in current geometry compared to geometry used for cal review. (Matt and Mihajlo).
 +
** Design team (Tim) will develop some layouts at the end of the calorimeter which could accommodate the wire-mesh pmt alternative.

Revision as of 13:53, 9 June 2008

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: May 27, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)
  3. Schedule

Agenda

  1. Updates
    • Calibration system update
    • FCAL
    • BCAL
      • Absolute light output of fibers
  2. Preparations for Lehman Review
  3. Review of Action-Item Tracker for Calorimetry
  4. Any other business

Minutes

Participants: Zisis, Andrei, George, Elton, Elke, Beni, Tim, Matt.

  • Note: Here are some brief to-do-list based on the summary discussion. (Elton).
  • Given the limited manpower and time, we decided to come up with a conceptual design based on wire-mesh pmts as an "alternative" backup for the Lehman Review.
  • Homework
    • Review segmentation requirements, especially for inner calorimeter (Zisis report on work to date)
    • Clarify geometry in current files (Beni)
    • Assess impact of material in current geometry compared to geometry used for cal review. (Matt and Mihajlo).
    • Design team (Tim) will develop some layouts at the end of the calorimeter which could accommodate the wire-mesh pmt alternative.