Difference between revisions of "June 3, 2010 Readout"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 27: | Line 27: | ||
## [http://www.jlab.org/Hall-D/software/wiki/images/c/c4/MPPC_Measurements.pdf MPPC Measurements] | ## [http://www.jlab.org/Hall-D/software/wiki/images/c/c4/MPPC_Measurements.pdf MPPC Measurements] | ||
## Comments on MOU | ## Comments on MOU | ||
+ | ## Progress on light guide prototyping | ||
# USM MOU/contract update (Elton) | # USM MOU/contract update (Elton) | ||
− | # Simulation runs | + | # Simulation runs (Will/Sergey) |
# Cosmic-ray setup at UofR | # Cosmic-ray setup at UofR | ||
# Geometry [[http://www.jlab.org/~huttonc/ | Latest readout assy]] | # Geometry [[http://www.jlab.org/~huttonc/ | Latest readout assy]] |
Revision as of 11:31, 3 June 2010
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone in CC F326 is 757-269-6337
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.
Contents
Items for followup from previous meeting
- Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference.
- Start a bulleted list of testing for the SiPMs (Serguey).
- Will to find out if there is any feedback from USM on terms and conditions from our procurement package.
Documents to Review
- GlueX-doc-1474 BCAL Dynamic Range from the Simulation with FLUKA
- GlueX-doc-1432 Trapezoidal guides for the light collection for SiPMs (Fig 22)
Tentative Agenda
- Announcements
- Review of Action Items
- Update - USM
- MPPC Measurements
- Comments on MOU
- Progress on light guide prototyping
- USM MOU/contract update (Elton)
- Simulation runs (Will/Sergey)
- Cosmic-ray setup at UofR
- Geometry [| Latest readout assy]
- SiPM Radiation Hardness Test (Update from Yi)
- I updated the recovery curves with more data i collected, no major change
- Hall A is still not ready for beam, hopefully by the end of this week they can take beam;
- Carl needs a little bit more time to give me the 1x1 mm SiPM and start to test the dark rates of 3x3 SiPMs, hopefully early next week.
- SiPM - Test Electronics (Fernando)
- Light guides
Minutes
Attending: