Difference between revisions of "June 3, 2010 Readout"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 25: Line 25:
 
# Review of Action Items
 
# Review of Action Items
 
# Update - USM  
 
# Update - USM  
 +
## [http://www.jlab.org/Hall-D/software/wiki/images/b/bb/MPPC_Test_Setup.V2.ppt Alam's presentation from last week]
 
## [http://www.jlab.org/Hall-D/software/wiki/images/c/c4/MPPC_Measurements.pdf MPPC Measurements]
 
## [http://www.jlab.org/Hall-D/software/wiki/images/c/c4/MPPC_Measurements.pdf MPPC Measurements]
 
## Comments on MOU (Will/Sergey)
 
## Comments on MOU (Will/Sergey)

Revision as of 12:43, 3 June 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference.
  2. Start a bulleted list of testing for the SiPMs (Serguey).
  3. Will to find out if there is any feedback from USM on terms and conditions from our procurement package.

Documents to Review

  • GlueX-doc-1474 BCAL Dynamic Range from the Simulation with FLUKA
  • GlueX-doc-1432 Trapezoidal guides for the light collection for SiPMs (Fig 22)

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update - USM
    1. Alam's presentation from last week
    2. MPPC Measurements
    3. Comments on MOU (Will/Sergey)
    4. Progress on light guide prototyping (Sergey)
  4. USM MOU/contract update (Elton)
  5. Simulation runs
  6. Cosmic-ray setup at UofR
  7. Geometry [| Latest readout assy]
  8. SiPM Radiation Hardness Test (Update from Yi)
    • I updated the recovery curves with more data i collected, no major change
    • Hall A is still not ready for beam, hopefully by the end of this week they can take beam;
    • Carl needs a little bit more time to give me the 1x1 mm SiPM and start to test the dark rates of 3x3 SiPMs, hopefully early next week.
  9. SiPM - Test Electronics (Fernando)
  10. Light guides

Minutes

Attending: