March 21, 2008 Calorimetry

From GlueXWiki
Revision as of 15:40, 21 March 2008 by Elton (Talk | contribs) (Minutes)

Jump to: navigation, search

Connection

  • The meeting will be held at 1:00 pm ET (11:00 am MST)
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: February 29, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)
  3. Schedule

Agenda

  1. Fiber Specifications
    • Fiber measurements (JLab and Regina) JLAB
  2. FCAL Update
    • Flash ADC time resolution tests with laser+PMT
  3. BCAL Update
    • SiPMs Schedule
    • SiPM results Carl Zorn [1]
    • Price of readout for outer layer for Hamamatsu
  4. Resolution effects from non-uniform response (Richard) - postponed to next meeting
  5. Calibration Update / Discussion (Athens) - postponed to next meeting
    • Goals for calibration
    • Deployment in various subsystems
  6. Any other business

Minutes

Online: George, Zisis, Andrei, Mihajlo, Alex, Fernando, Carl, Tim, Elton, Elke
Notes by Elton


  1. Fiber Specifications
    • Fiber measurements (JLab and Regina)
      • JLAB (Carl)
      • (Regina) Kuraray fibers have arrived, but were waiting for SMA connectors for testing. These have been received, so fiber testing can proceed.
  2. FCAL Update
    • Flash ADC time resolution tests with laser+PMT. Mihajlo reported that he is setting up a test in the lab to measure the extraction of timing from measurements with a flash. The current setup

includes a laser feeding a pmt and the original single-channel FLASH ADC from Paul Smith. Ultimately the goal is to understand the accuracy of timing for the glass in the Fcal.

  1. BCAL Update
    • SiPMs Schedule
    • SiPM results Carl Zorn [2]
    • Price of readout for outer layer for Hamamatsu
  2. Resolution effects from non-uniform response (Richard) - postponed to next meeting
  3. Calibration Update / Discussion (Athens) - postponed to next meeting
    • Goals for calibration
    • Deployment in various subsystems