Difference between revisions of "March 9, 2021"

From GlueXWiki
Jump to: navigation, search
(Connection instructions)
Line 11: Line 11:
 
* [https://halldweb.jlab.org/detectors/fcal2/crystals/QA_check/second_batch_10_2020/transmission/ Transmission measurement]
 
* [https://halldweb.jlab.org/detectors/fcal2/crystals/QA_check/second_batch_10_2020/transmission/ Transmission measurement]
 
:: - [https://halldweb.jlab.org/detectors/fcal2/crystals/QA_check/second_batch_10_2020/transmission/SIC-Yuan-2020-PWO-Fcal-B2-list.xlsx Comparison with measurements in SICCAS]
 
:: - [https://halldweb.jlab.org/detectors/fcal2/crystals/QA_check/second_batch_10_2020/transmission/SIC-Yuan-2020-PWO-Fcal-B2-list.xlsx Comparison with measurements in SICCAS]
 +
 +
 +
* [https://halldweb.jlab.org/DocDB/0049/004934/002/fcal2_2_18_2021.pdf Status of the FCAL2 construction]

Revision as of 20:43, 9 March 2021

Connection instructions

  • Connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
    • Dial: 1 888 240 2560 (US or Canada only)


- Comparison with measurements in SICCAS