# Updates to the Mechanical Installation Schedule ([[Media:Mar 2013 Install Schedule.pdf | Latest Rendition of Install Schedule]]) (Tim)
 
# Updates to the Mechanical Installation Schedule ([[Media:Mar 2013 Install Schedule.pdf | Latest Rendition of Install Schedule]]) (Tim)
# Electronics Installation Schedule (Fernando) [[https://halldweb1.jlab.org/wiki/index.php/Status_%26_Schedules | Schedule]]
+
# Electronics Installation Schedule (Fernando) [[https://halldweb.jlab.org/wiki/index.php/Status_%26_Schedules | Schedule]]
 
# [[Summer 2013 Manpower Contributions |Summer manpower]]
 
# [[Summer 2013 Manpower Contributions |Summer manpower]]
 
# Magnet Mapping (Tim)([[Media:Tagger mapping.jpg | Tagger Magnet Mapping system]])
 
# Magnet Mapping (Tim)([[Media:Tagger mapping.jpg | Tagger Magnet Mapping system]])
 
# Tagger Magnet Installation ([[Media:Vacuum chamber test fit.jpg | Vacuum chamber test fit]])
 
# Tagger Magnet Installation ([[Media:Vacuum chamber test fit.jpg | Vacuum chamber test fit]])
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2200 Microscope Installation]
+
# Microscope Installation
 +
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2200 Tagger microscope installation & commissioning document]
 +
#* Signal cable lengths
 
# Tagger Array Installation
 
# Tagger Array Installation
 
# Pair Spectrometer Installation
 
# Pair Spectrometer Installation
Line 33: Line 35:
 
# FCAL Insatllation
 
# FCAL Insatllation
 
# TOF  Installation
 
# TOF  Installation
# FDC  Installation  
+
# FDC  Installation [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf document], and [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_install_pres.pdf short presentation]
 
# CDC  Installation
 
# CDC  Installation
 
# A.O.B.
 
# A.O.B.
  
 
== Minutes ==
 
== Minutes ==

Latest revision as of 17:12, 24 February 2017

Meeting Time and Place

Friday, May 10, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone (supported on request only) dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#


Up to GlueX/Hall-D Installation Meetings

Action Items From Last Meeting

Agenda

  1. Announcements
  2. Updates to the Mechanical Installation Schedule ( Latest Rendition of Install Schedule) (Tim)
  3. Electronics Installation Schedule (Fernando) [| Schedule]
  4. Summer manpower
  5. Magnet Mapping (Tim)( Tagger Magnet Mapping system)
  6. Tagger Magnet Installation ( Vacuum chamber test fit)
  7. Microscope Installation
  8. Tagger Array Installation
  9. Pair Spectrometer Installation
  10. BCAL Installation ( BCAL assy in hall)
  11. FCAL Insatllation
  12. TOF Installation
  13. FDC Installation document, and short presentation
  14. CDC Installation
  15. A.O.B.

Minutes