Revision as of 10:24, 10 May 2013
Meeting Time and Place
Friday, May 10, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326
Connections
To connect from the outside, please use ESNET
- ) ESNET: 8542553
- )To connect by telephone (supported on request only) dial:
- You can look up toll-free number at http://www.readytalk.com/intl
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call)
- enter access code followed by the # sign: 3421244#
Up to GlueX/Hall-D Installation Meetings
Action Items From Last Meeting
Agenda
- Announcements
- Updates to the Mechanical Installation Schedule ( Latest Rendition of Install Schedule) (Tim)
- Electronics Installation Schedule (Fernando) [| Schedule]
- Summer manpower
- Magnet Mapping (Tim)( Tagger Magnet Mapping system)
- Tagger Magnet Installation ( Vacuum chamber test fit)
- Microscope Installation
- Tagger Array Installation
- Pair Spectrometer Installation
- BCAL Installation ( BCAL assy in hall)
- FCAL Insatllation
- TOF Installation
- FDC Installation document, and short presentation
- CDC Installation
- A.O.B.