Difference between revisions of "May 13,2020 Tech group meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(4 intermediate revisions by the same user not shown)
Line 4: Line 4:
  
 
== Agenda ==
 
== Agenda ==
* Covid-19  https://www.statista.com/chart/21269/daily-deaths-covid-19-selected-countries/
+
* Covid-19  https://www.governor.virginia.gov/media/governorvirginiagov/governor-of-virginia/images/press-photos/Phase-One-Slide-Social.jpg
 
* Jlab Update -  [[Media:Physics_mtg_12May.png]]
 
* Jlab Update -  [[Media:Physics_mtg_12May.png]]
* Time Charges - If there is work for you to do and you are not doing it (besides things related to shutdown of schools etc..), charge sick or vacation
+
* On Call Activity -- Solenoid VCL alarms - Cryo had to flush a heat exchanger for one of the compressors
* On Call Activity -- Tim  nothing to report
+
* Fall protection update training https://www.jlab.org/div_dept/train/SAF202%20Fall%20protection/SAF%20202B%20-%20Fall%20Protection%20(Site%20Specific)%20(Published)/index.html
 
* Updates
 
* Updates
** Tim -- CPP Design, procurements and Analysis, GlueX Collaboration Meeting Prep https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-May-2020, writing and Engineering systems Training, P&ID, Dibert and Leybold training
+
** Tim -- CPP Design, procurements and Analysis,  
** Mark -- Return planning [[Media:Beam Resumption plan.docx]], Log entries, Daily Virtual walktrough, training  
+
** Mark -- Return planning [[Media:Beam Resumption plan_tw.docx]], Log entries, Daily Virtual walktrough, training  
** Scot -- SAD schedule, training, Gas system P&ID
+
** Scot -- Resumption Schedule, SAD schedule, training   
** Josh -- welding, training tagger window replacement , ComCal Chiller P&ID etc....
+
** Josh -- Review Resumption Documentation training tagger window replacement  
 
** Stephanie --  CPP Redesign for alignment, CAD
 
** Stephanie --  CPP Redesign for alignment, CAD
 
** Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps
 
** Keith -- Vacuum training, DIRC strongback procedure, replacement water filters and UV lamps
Line 23: Line 23:
 
** Send a daily check in email response to the group
 
** Send a daily check in email response to the group
 
** Complete any training that is due within the next 4 months
 
** Complete any training that is due within the next 4 months
 +
** Do any online training that may be available
 
** Update documentation you are responsible for and are able to do from home
 
** Update documentation you are responsible for and are able to do from home
 
** Familiarize with Bluejeans and attend meetings as required
 
** Familiarize with Bluejeans and attend meetings as required

Latest revision as of 07:05, 13 May 2020

Meeting Time and Place

Wednesday May 13, 2020 at 9am Bluejeans https://bluejeans.com/835373169

Agenda