# Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference.
 
# Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference.
# <strike> Fill out loan agreement for SiPM arrays at UofR (Elton). </strike>
 
 
# Start a bulleted list of testing for the SiPMs (Serguey).
 
# Start a bulleted list of testing for the SiPMs (Serguey).
# Distribution of p.e. corresponding to each sensor within the readout sum (Andrei).
+
# Distribution of p.e. corresponding to each sensor within the readout sum (Andrei). Add min and max for both upstream and downstream readouts.
  
 
= Documents to Review=
 
= Documents to Review=

Revision as of 14:25, 6 May 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Serguei agreed to send out a testing proposal for comments, including preliminary circuit designs and list of available equipment at USM for reference.
  2. Start a bulleted list of testing for the SiPMs (Serguey).
  3. Distribution of p.e. corresponding to each sensor within the readout sum (Andrei). Add min and max for both upstream and downstream readouts.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update - USM
  4. USM MOU/contract update (Elton)
  5. Simulation runs
  6. Geometry
  7. SiPM Radiation Hardness Test (Yi)
  8. SiPM - Testing Schedules
  9. Light guides

Minutes

Attending: