(Created page with "== Action Items from previous meetings == # Determine if swapped bias pins was accidental or in design (Chris) # Develop front and back views of jumper sheets. Also get latest v...")
 
(Action Items from previous meetings)
Line 5: Line 5:
 
# Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
 
# Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
 
# Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot)
 
# Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot)
 +
# Design tooling/procedure for making the patterns for wrapping from tedlar (Jim)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 08:58, 11 May 2012

Action Items from previous meetings

  1. Determine if swapped bias pins was accidental or in design (Chris)
  2. Develop front and back views of jumper sheets. Also get latest version of drawings (Jack)
  3. Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
  4. Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot)
  5. Design tooling/procedure for making the patterns for wrapping from tedlar (Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. Beam test experience (Elton)
    • Connections to RTD
    • Installation and space for monitoring control board
  5. SiPM production testing (everyone)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Chris)
  11. Light guide gluing setup
    • Light guides
    • Bcal LED boards and cabling / control boards
    • Wrapping for light guides

Minutes

Attending: