Difference between revisions of "May 24, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Tentative Agenda)
Line 14: Line 14:
 
# Schedule, reporting, and manpower (Elton)
 
# Schedule, reporting, and manpower (Elton)
 
# Beam test experience (Elton)
 
# Beam test experience (Elton)
#* Connections to RTD
 
#* Installation and space for monitoring control board
 
 
# SiPM production testing (everyone)
 
# SiPM production testing (everyone)
 
# Mechanical assembly (Scot)
 
# Mechanical assembly (Scot)
Line 23: Line 21:
 
# Preamp-summing (Chris)
 
# Preamp-summing (Chris)
 
# Light guide gluing setup
 
# Light guide gluing setup
#* Light guides
 
#* Bcal LED boards and cabling / control boards
 
 
#* Wrapping for light guides
 
#* Wrapping for light guides
  
 
== Minutes ==
 
== Minutes ==
 
''Attending:
 
''Attending:

Revision as of 15:13, 23 May 2012

Action Items from previous meetings

  1. Determine if swapped bias pins was accidental or in design (Chris)
  2. Develop front and back views of jumper sheets. Also get latest version of drawings (Jack)
  3. Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
  4. Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot)
  5. Design tooling/procedure for making the patterns for wrapping from tedlar (Jim)
  6. Review Fcal LED and controller monitoring boards (Fernando)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. Beam test experience (Elton)
  5. SiPM production testing (everyone)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Chris)
  11. Light guide gluing setup
    • Wrapping for light guides

Minutes

Attending: