== Action Items from previous meetings ==
 
== Action Items from previous meetings ==
  
# Determine if swapped bias pins was accidental or in design (Chris)
+
# <strike> Determine if swapped bias pins was accidental or in design (Chris) </strike>
 
# Develop front and back views of jumper sheets. Also get latest version of drawings (Jack)
 
# Develop front and back views of jumper sheets. Also get latest version of drawings (Jack)
 
# Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
 
# Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
# Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot)
+
# <strike> Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot) </strike>
 
# Design tooling/procedure for making the patterns for wrapping from tedlar (Jim)
 
# Design tooling/procedure for making the patterns for wrapping from tedlar (Jim)
 
# Review Fcal LED and controller monitoring boards (Fernando)
 
# Review Fcal LED and controller monitoring boards (Fernando)
Line 25: Line 25:
 
== Minutes ==
 
== Minutes ==
 
''Attending:
 
''Attending:
 +
 +
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
# Beam test experience (Elton)
 +
# SiPM production testing (everyone)
 +
# Mechanical assembly (Scot)
 +
# Mechanical (Jim)
 +
# Mechanical drawings (Chuck)
 +
# Temperature compensation (Jack)
 +
# Preamp-summing (Chris)
 +
# Light guide gluing setup
 +
#* Wrapping for light guides

Revision as of 16:06, 24 May 2012

Action Items from previous meetings

  1. Determine if swapped bias pins was accidental or in design (Chris)
  2. Develop front and back views of jumper sheets. Also get latest version of drawings (Jack)
  3. Check into AC units based on Peltier coolers for SiPM production tests (Fernando)
  4. Order and assemble a third SiPM puller as a backup for JLab (Jim and Scot)
  5. Design tooling/procedure for making the patterns for wrapping from tedlar (Jim)
  6. Review Fcal LED and controller monitoring boards (Fernando)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. Beam test experience (Elton)
  5. SiPM production testing (everyone)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Chris)
  11. Light guide gluing setup
    • Wrapping for light guides

Minutes

Attending:


  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. Beam test experience (Elton)
  5. SiPM production testing (everyone)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Chris)
  11. Light guide gluing setup
    • Wrapping for light guides