Difference between revisions of "May 24, 2018 DIRC Optical Box"
From GlueXWiki
(→Agenda) |
|||
(4 intermediate revisions by 2 users not shown) | |||
Line 18: | Line 18: | ||
# Announcement | # Announcement | ||
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25] | #* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25] | ||
+ | #* Pre-brief material online by June 15 | ||
# Optical box status | # Optical box status | ||
#* Status update (Ernie and Jason) | #* Status update (Ernie and Jason) | ||
Line 27: | Line 28: | ||
# Installation of bar boxes and optical box in Hall D | # Installation of bar boxes and optical box in Hall D | ||
#* Discussion of installation [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3596 schedule in Hall D] (Tim, et al) | #* Discussion of installation [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3596 schedule in Hall D] (Tim, et al) | ||
− | # Controls discussion (All) | + | # [https://halldweb.jlab.org/wiki/images/c/ce/Dirc_controls_v2.pdf Controls discussion] (All) |
#* [https://halldweb.jlab.org/wiki/images/2/2a/DIRC_Environment_11.17.pdf Environment (from November)] (Nick) | #* [https://halldweb.jlab.org/wiki/images/2/2a/DIRC_Environment_11.17.pdf Environment (from November)] (Nick) | ||
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3576 Module orientation and LV/HV controls] | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3576 Module orientation and LV/HV controls] | ||
Line 35: | Line 36: | ||
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3521 Optical Box Alignment strawman] (Tim) | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3521 Optical Box Alignment strawman] (Tim) | ||
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3578 Laser Alignment fixture] (Tim) | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3578 Laser Alignment fixture] (Tim) | ||
+ | #* [[Media:DIRCFrame.jpg|DIRC Frame survey reference]] | ||
# AOB | # AOB |
Latest revision as of 13:04, 6 June 2018
Meeting Information
GlueX DIRC Optical Box Meeting
Thursday May 24, 2018
10:00 am, EDT
JLab L207
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcement
- Experimental Readiness Review June 25
- Pre-brief material online by June 15
- Optical box status
- Status update (Ernie and Jason)
- Box production at Lesker: plan for visit and delivery estimate
- PMT test fixture: Assembly procedure and discussion
- Window quotes and delivery schedule
- Dark box conceptual design
- Other items and quotes
- Status update (Ernie and Jason)
- Installation of bar boxes and optical box in Hall D
- Discussion of installation schedule in Hall D (Tim, et al)
- Controls discussion (All)
- Environment (from November) (Nick)
- Module orientation and LV/HV controls
- Interlocks discussion
- Discussion of assembly procedure and timeline:
- AOB