Difference between revisions of "May 24, 2018 DIRC Optical Box"
From GlueXWiki
Line 1: | Line 1: | ||
== Meeting Information == | == Meeting Information == | ||
GlueX DIRC Optical Box Meeting<br> | GlueX DIRC Optical Box Meeting<br> | ||
− | Thursday | + | Thursday May 24, 2018<br> |
10:00 am, EDT<br> | 10:00 am, EDT<br> | ||
− | JLab | + | JLab L207 <br> |
== Connection Using Bluejeans == | == Connection Using Bluejeans == | ||
Line 19: | Line 19: | ||
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25] | #* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25] | ||
#* Pre-brief material online by June 15 | #* Pre-brief material online by June 15 | ||
− | |||
# Optical box status | # Optical box status | ||
#* Status update (Ernie and Jason) | #* Status update (Ernie and Jason) | ||
− | #** Box production at Lesker: | + | #** Box production at Lesker: plan for visit and delivery estimate |
#** PMT test fixture: Assembly procedure and discussion | #** PMT test fixture: Assembly procedure and discussion | ||
#** Window quotes and delivery schedule | #** Window quotes and delivery schedule | ||
Line 29: | Line 28: | ||
# Installation of bar boxes and optical box in Hall D | # Installation of bar boxes and optical box in Hall D | ||
#* Discussion of installation [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3596 schedule in Hall D] (Tim, et al) | #* Discussion of installation [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3596 schedule in Hall D] (Tim, et al) | ||
+ | # [https://halldweb.jlab.org/wiki/images/c/ce/Dirc_controls_v2.pdf Controls discussion] (All) | ||
+ | #* [https://halldweb.jlab.org/wiki/images/2/2a/DIRC_Environment_11.17.pdf Environment (from November)] (Nick) | ||
+ | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3576 Module orientation and LV/HV controls] | ||
+ | #* Interlocks discussion | ||
# Discussion of assembly procedure and timeline: | # Discussion of assembly procedure and timeline: | ||
#* [https://halldweb.jlab.org/wiki/images/a/aa/20180220_GlueX_Assembly_Sequence.pdf Plans for assembly and testing at Bates and in Hall D] | #* [https://halldweb.jlab.org/wiki/images/a/aa/20180220_GlueX_Assembly_Sequence.pdf Plans for assembly and testing at Bates and in Hall D] |
Latest revision as of 13:04, 6 June 2018
Meeting Information
GlueX DIRC Optical Box Meeting
Thursday May 24, 2018
10:00 am, EDT
JLab L207
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcement
- Experimental Readiness Review June 25
- Pre-brief material online by June 15
- Optical box status
- Status update (Ernie and Jason)
- Box production at Lesker: plan for visit and delivery estimate
- PMT test fixture: Assembly procedure and discussion
- Window quotes and delivery schedule
- Dark box conceptual design
- Other items and quotes
- Status update (Ernie and Jason)
- Installation of bar boxes and optical box in Hall D
- Discussion of installation schedule in Hall D (Tim, et al)
- Controls discussion (All)
- Environment (from November) (Nick)
- Module orientation and LV/HV controls
- Interlocks discussion
- Discussion of assembly procedure and timeline:
- AOB