May 26, 2011 Calibration/Monitoring

From GlueXWiki
Revision as of 11:21, 26 May 2011 by Zisis (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Teleconference Time: 08:00 CST (Regina) / 10:00 EDT / 16:00 GMT+2 (Athens)

  • Connection: ESNET

Background information

Action Items

  1. Can George calculate the % deviation from linearity on his plot?
  2. USM should be contacted to send more LGs to Athens: Athens has requested 15 units, 12 for one side and 3 for the opposing side of the baby cal. Regina is working on its request.
  3. Christina will probe Kappos for cabling and other board issues.
  4. BCAL Fibre location and angle, as well as mounting sequence should be flushed out. (Zisis)

Tentative Agenda

  1. MoU Progress
  2. Monitoring system concepts

Minutes

Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)