Difference between revisions of "May 27, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(4 intermediate revisions by one other user not shown)
Line 16: Line 16:
 
= Agenda =
 
= Agenda =
  
# Calibration system update (?)
+
# Calibration system update [[Media:PulseHeight.ppt]]
 
# FCAL Update
 
# FCAL Update
 
#* Timing resolution [http://dustbunny.physics.indiana.edu/~mikornic/GlueX/fadc/DTrms_sig.pdf]
 
#* Timing resolution [http://dustbunny.physics.indiana.edu/~mikornic/GlueX/fadc/DTrms_sig.pdf]
 
#* Prototype [http://dustbunny.physics.indiana.edu/~mashephe/fcal_array.JPG]
 
#* Prototype [http://dustbunny.physics.indiana.edu/~mashephe/fcal_array.JPG]
 
# BCAL Update
 
# BCAL Update
#* Richard's [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1012 GlueX-doc-1012-v2]
+
#* Update on BCAL and Fiber NIM papers
 
#* SiPM work (JLab and Regina)
 
#* SiPM work (JLab and Regina)
 +
#** SiPMPlus report [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1066 GlueX-doc-1066-v1]
 +
#* Richard's [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1012 GlueX-doc-1012-v2]
 
#* Cabling scheme and light tightness
 
#* Cabling scheme and light tightness
 
#* [[Private:Fiber Specs | Fiber Specifications]] (Elton)
 
#* [[Private:Fiber Specs | Fiber Specifications]] (Elton)
Line 29: Line 31:
 
#* Alternative Readout
 
#* Alternative Readout
 
#* Detailed schedule and plans for Construction
 
#* Detailed schedule and plans for Construction
 +
#** Module transportation
 
# Any other business
 
# Any other business
  
 
=Minutes=
 
=Minutes=
 
Participants:
 
Participants:

Latest revision as of 17:11, 24 February 2017

Connection

  • The meeting will be held at 10:30 am ET
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Reference Documents

  1. Previous minutes: May 5, 2008 Calorimetry
  2. Schedule, Tracker and Drawings (gluex pass)
  3. Schedule

Agenda

  1. Calibration system update Media:PulseHeight.ppt
  2. FCAL Update
    • Timing resolution [1]
    • Prototype [2]
  3. BCAL Update
  4. Preparations for Lehman Review
    • Alternative Readout
    • Detailed schedule and plans for Construction
      • Module transportation
  5. Any other business

Minutes

Participants: