Difference between revisions of "May 27, 2010 Calorimetry"
From GlueXWiki
(→Items for followup from previous meeting(s)) |
|||
Line 14: | Line 14: | ||
#* Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR). | #* Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR). | ||
# Fcal | # Fcal | ||
− | #* Draft agenda for Readiness Review (Elton and Matt) | + | #* <strike> Draft agenda for Readiness Review (Elton and Matt) </strike> |
#* Decision on rad hard detectors | #* Decision on rad hard detectors | ||
# Bcal | # Bcal | ||
− | #* Send copy of contract with Ross to JLab | + | #* <strike> Send copy of contract with Ross to JLab </strike> |
#* Report on beam test data at small incidence angles. | #* Report on beam test data at small incidence angles. | ||
Revision as of 15:09, 26 May 2010
Teleconference Time: 11:00 a.m. EDT
- ESNET and EVO session
- Phone in CC F326 is 757-269-6337
- Phone in the Regina Videoconference Suite is 306-585-4204
- Phone only if requested:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone line by request only.
Contents
Items for followup from previous meeting(s)
- Monitoring
- Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR).
- Fcal
-
Draft agenda for Readiness Review (Elton and Matt) - Decision on rad hard detectors
-
- Bcal
-
Send copy of contract with Ross to JLab - Report on beam test data at small incidence angles.
-
Discussion of Options for Radiation-Hard Insert
Options for Radiation-Hard Insert
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration/Monitoring
- FCAL
- Construction status
- FCAL Fabrication Readiness Review
- To shashlyk or not to shashlyk. Options (Elton) see Table. Physics Impact, see GlueX-doc-1481
- BCAL
- Construction Status
- Simulations
- Other Updates
Minutes
Attendees: