Difference between revisions of "May 7, 2020 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Minutes and Action Items)
Line 25: Line 25:
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==
 
*Reviewed minutes of last meeting
 
*Reviewed minutes of last meeting
* Need to notch steel at bottom to clear connectors -- Stephanie
+
 
* Look at using a 90° connector -- Rory
+
* Check gas line bending to clear beam left dark room -- Rory
+
* Alignment requirements relative to BL - X&Y ±2mm, Z ±1cm
+
** Met with survey - need to add x,y and z adjustments for the entire system to achieve this
+
* Desire to have a small block of 5cm lead movable
+
** can be a local adjustment
+
** Ring with 7.5cm hole
+
** ok to have 10cm thick where overlap is
+
** Holes to be square with radius corner
+
** Hole size should have 1mm precision
+
** What should be the size of the hole in the large lead absorber?
+
* Need to check repeatability of detector after moving FCAL platform
+
* Develop a procurement plan for this FY -- Tim
+
 
* Set up new meeting in 2 weeks
 
* Set up new meeting in 2 weeks

Revision as of 08:47, 7 May 2020

Meeting Time and Place =

Thursday May 7, 2020, 1:30pm Bluejeans https://bluejeans.com/710246635/3638?src=calendarLink

  • Present - Elton, Dave, Stephanie, Llya, Rory (remote)

Agenda

Minutes and Action Items

  • Reviewed minutes of last meeting
  • Set up new meeting in 2 weeks