Difference between revisions of "May 9, 2013 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Tentative Agenda)
 
Line 9: Line 9:
 
# Action Items
 
# Action Items
 
# Light guides (Tina)
 
# Light guides (Tina)
 +
# Light guide testing (Elton)
 
# SiPM production testing (Yi)
 
# SiPM production testing (Yi)
 
# Mechanical assembly (Jim)
 
# Mechanical assembly (Jim)

Latest revision as of 12:31, 3 May 2013

Action Items from previous meetings

  1. Mount one of the completed assemblies onto a module in the ESB to evaluate any possible interferences with cables. (Chris and Nic)
  2. Order second "half" top plate and modify tool for single replacement (Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Light guides (Tina)
  4. Light guide testing (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Electronic boards and SiPM sorting (Fernando and Chris)

Minutes

Attending: