May 9, 2013 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 12:19, 3 May 2013 by Elton (Talk | contribs) (Action Items from previous meetings)

Jump to: navigation, search

Action Items from previous meetings

  1. Mount one of the completed assemblies onto a module in the ESB to evaluate any possible interferences with cables. (Chris and Nic)
  2. Order second "half" top plate and modify tool for single replacement (Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Light guides (Tina)
  4. SiPM production testing (Yi)
  5. Mechanical assembly (Jim)
  6. Electronic boards and SiPM sorting (Fernando and Chris)

Minutes

Attending: