Difference between revisions of "Meeting-11-16-2017"
From GlueXWiki
Line 28: | Line 28: | ||
== Run preparations == | == Run preparations == | ||
− | - | + | - Nacer made presentation about dE/dx |
− | - FDC threshold upgrade is done: all | + | - FDC threshold upgrade is done: all mods, cables installed; Hovanes finished the control system. Has to be tested, best with DAQ and software trigger looking at the noise. |
- There WAS a problem with one FDC LV module - several channels didn't regulate the voltage. Module was replaced and now is OK. | - There WAS a problem with one FDC LV module - several channels didn't regulate the voltage. Module was replaced and now is OK. |
Revision as of 18:20, 20 November 2017
November 16, 2017 Drift Chamber meeting
Connection
- Instructions for Bluejeans meeting connection
- Meeting ID: 290664653
Headline text
- To join via a Web Browser, go to the page [1] https://bluejeans.com/290664653.
Agenda
- Detector updates:
- CDC update
- dE/dx (Nacer)
- FDC update
- CDC update
- Tracking
- 2016 - 2017 comparison Sean, Justin
- fADC125
- Other