April 8, 2010 FDC meeting


Tentative Agenda

  1. Off-site production space
    • status
    • requirements, floor plan
  2. Electronics (Fernando)
    • finalizing PCB design
    • cable procurement
  3. Cathode redesign (Bill, Roger)
  4. Redesigned frame prototype
    • plans for tests
  5. Full scale prototype (Beni)
    • two-layer HV tests
    • plans for the third layer
    • preparation for cosmics tests
  6. Other