Difference between revisions of "Minutes-6-17-2010"

From GlueXWiki
Jump to: navigation, search
 
Line 8: Line 8:
 
# Electronics  
 
# Electronics  
 
#* fADC125 status (Gerard, Fernando)  
 
#* fADC125 status (Gerard, Fernando)  
# Cathode redesign: finalizing, card grounding (Roger)  
+
# Cathode redesign: finalizing, card grounding (Roger, Fernando)  
 
# Full-scale prototype tests
 
# Full-scale prototype tests
 
#* tests with fADC [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 486 - 489] (Lubomir)
 
#* tests with fADC [http://www.jlab.org/Hall-D/detector/fdclog/ FDC Log Book, pages 486 - 489] (Lubomir)

Revision as of 15:32, 16 June 2010

June 17, 2010 FDC meeting

Tentative Agenda

  1. Production
    • 727 B.C. status
    • plans for wire stringing
  2. Electronics
    • fADC125 status (Gerard, Fernando)
  3. Cathode redesign: finalizing, card grounding (Roger, Fernando)
  4. Full-scale prototype tests
  5. Other