Difference between revisions of "Minutes-6-17-2010"

From GlueXWiki
Jump to: navigation, search
Line 5: Line 5:
 
# Production
 
# Production
 
#* 727 B.C. status
 
#* 727 B.C. status
#* plans for wire stringing
+
#* plans for wire stringing [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail2.jpg pin rail2], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PinRail.jpg pin rail], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasCam.jpg pos meas cam], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeas.jpg pos meas ], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PosMeasParts.jpg pos meas parts], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/PretensionScrews.jpg pretension screw], [http://www.jlab.org/Hall-D/detector/fdc/WireStringing/StringTable3.jpg string table]
 
# Electronics  
 
# Electronics  
 
#* fADC125 status (Gerard, Fernando)  
 
#* fADC125 status (Gerard, Fernando)  

Revision as of 11:43, 17 June 2010

June 17, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics
    • fADC125 status (Gerard, Fernando)
  3. Cathode redesign: finalizing, card grounding (Roger, Fernando)
  4. Full-scale prototype tests
  5. Other