= Minutes =
 
= Minutes =
Participants: Bill, Casey, Glenn, Roger, Beni, Chuck, Fernando, Simon, and Lubomir
+
Participants: Simon, Beni, Eugene, Casey, Roger, Mark, Fernando, and Lubomir
  
 
== Production ==         
 
== Production ==         
- We discussed only the production planning. Bill with the help of Chuck put the cathode production on the FastTrack. When a pdf version will be available it will be linked to the minutes of this meting. The production of one cathode sandwich  (cathode and ground planes) will take about four days with five people: four techs cutting, gluing, stretching the foil and one electrical tech doing the soldering work. The second type of cathode sandwich doesn't have a ground plane which makes the production by a half day faster, but if assuming the same time, we will have 8 days per chamber layer or for 30 layers, 240 days in total.
+
 
 +
- The PR for the clean room was submitted at the end of last week. The specifications and estimate are linked above. The estimate is for $250K for the clean room, including the electrical installations, excluding the AC. According to the schedule, the installation must be completed and the room commissioned on Sep. 13 this year. The CC will take care of the network, including wireless. We will buy a color laser printer/copier/scanner for ~$700, i.e. low quality. 
 +
 
 +
- We discussed
  
 
-Fernando had to go to another meeting, so moving to electronics:
 
-Fernando had to go to another meeting, so moving to electronics:

Revision as of 12:44, 18 June 2010

June 17, 2010 FDC meeting

Tentative Agenda

  1. Production
  2. Electronics
  3. Cathode redesign: finalizing, card grounding (Roger, Fernando)
  4. Full-scale prototype tests
  5. Other