Difference between revisions of "Minutes-9-10-2015"

From GlueXWiki
Jump to: navigation, search
Line 37: Line 37:
 
== FDC update ==
 
== FDC update ==
  
- Scope picture of the drift times in the two thick chambers of the spare package shown above, using 90Sr source and a trigger made on the scope by coincidence of two parallel wires from the two chambers. The drift times look 
+
- Scope picture of the drift times in the two thick chambers of the spare package shown above, using 90Sr source and a trigger made on the scope by coincidence of two parallel wires from the two chambers. The max drift times for the first cell is about 9 usec, while Garfield predicts ~6 usec. The next two plots show the total charge vs max amplitude with 55Fe source: it demonstrates that with 90/10 gas mixture one can see the argon and escape peaks, also for big drift times they are broader (in time) possibly due to diffusion.
 
+
== Electronics ==
+
 
+
- Nick; The LV module that failed is working fine under load. The pre-amp production is going well.
+
 
+
== Engineering ==
+
 
+
- Dave is planing to shut down the interlock systems on FDC and CDC whenever that is convenient.
+
 
+
-->
+

Revision as of 12:33, 17 September 2015

September 10, 2015 Drift Chamber meeting

Connection

  1. Instructions for Bluejeans meeting connection
  2. Meeting ID: 290664653
  3. To join via a Web Browser, go to the page [1] https://bluejeans.com/290664653.

Agenda

  1. CDC update
  2. FDC update
    • studies with 90Sr and 55Fe on spare package: [2],[3], [4]
  3. Electronics
  4. Engineering
  5. Other