1). Tim and Chuck have not made any additional progress on the FDC
+
1). Mechanical Drawings:
 +
    Tim and Chuck have not made any additional progress on the FDC
 
     mechanical drawings as they have been working on drawings for
 
     mechanical drawings as they have been working on drawings for
 
     the entire GlueX detector system.
 
     the entire GlueX detector system.
  
2). We discussed the cable support system and how the FDC system will
+
2). Cable Support System:
 +
  - We discussed the cable support system and how the FDC system will
 
     be installed within the solenoid.  The issues include the downstream
 
     be installed within the solenoid.  The issues include the downstream
 
     end of the BCAL with the Winston cones, SiPMs, and cables.  We
 
     end of the BCAL with the Winston cones, SiPMs, and cables.  We
Line 20: Line 22:
 
     a single unit.
 
     a single unit.
  
3). The FDC system should be able to be connected to power and readout
+
  - The FDC system should be able to be connected to power and readout
 
     on the installation cart and then slide into GlueX.  Tim and Chuck
 
     on the installation cart and then slide into GlueX.  Tim and Chuck
 
     will begin to work on the design.
 
     will begin to work on the design.
  
4). We discussed issues with preamp cooling - water vs. dry air.  More
+
3). Cooling Issues:
 +
    We discussed issues with preamp cooling - water vs. dry air.  More
 
     details are needed from Mitch Newcomer regarding the ASICs before
 
     details are needed from Mitch Newcomer regarding the ASICs before
 
     we can proceed. DSC will follow up on this.
 
     we can proceed. DSC will follow up on this.
  
5). We discussed how to poer the ASICs with a common input line (or
+
4). Preamp Power:
 +
  - We discussed how to power the ASICs with a common input line (or
 
     lines) so that we don't have to make connections separately to
 
     lines) so that we don't have to make connections separately to
 
     each daughter board.
 
     each daughter board.
 
   - We need to discuss this with Roger and Kim at our next meeting.
 
   - We need to discuss this with Roger and Kim at our next meeting.
  
6). We reviewed the FDC budget - Brian was brought up to date on the
+
5). FDC Budget:
 +
  - We reviewed the FDC budget - Brian was brought up to date on the
 
     numbers that he should help to provide.  The accuracy level is
 
     numbers that he should help to provide.  The accuracy level is
 
     30% for our purposes.
 
     30% for our purposes.
   - The budget is due to Elton by ~ Dec. 15.
+
   - The budget is due to Elton and Curtis by Dec. 19.
  
7). Roger has completed work on the dummy cathode plane.  Due to the
+
6). Dummy Cathode Design:
 +
    Roger has completed work on the dummy cathode plane.  Due to the
 
     $20k cost, we need Elton to sign off on this.
 
     $20k cost, we need Elton to sign off on this.
  
 
Minutes prepared by Daniel.  Send any comments or corrections along.
 
Minutes prepared by Daniel.  Send any comments or corrections along.

Revision as of 09:24, 13 December 2006

FDC Weekly Meeting

Date: November 22, 2006

Participants: Daniel, Brian, Simon, Tim, Chuck

Next Meeting: Wednesday, November 29, 2006 @ 1:30 p.m.


1). Mechanical Drawings:

   Tim and Chuck have not made any additional progress on the FDC
   mechanical drawings as they have been working on drawings for
   the entire GlueX detector system.

2). Cable Support System:

 - We discussed the cable support system and how the FDC system will
   be installed within the solenoid.  The issues include the downstream
   end of the BCAL with the Winston cones, SiPMs, and cables.  We
   cannot be in contact with any of this.  Also the FDC system will be
   assembled onto a special cart and will engage with the fixed rails
   within the solenoid.  The FDC system will then slide into place as
   a single unit.
 - The FDC system should be able to be connected to power and readout
   on the installation cart and then slide into GlueX.  Tim and Chuck
   will begin to work on the design.

3). Cooling Issues:

   We discussed issues with preamp cooling - water vs. dry air.  More
   details are needed from Mitch Newcomer regarding the ASICs before
   we can proceed. DSC will follow up on this.

4). Preamp Power:

 - We discussed how to power the ASICs with a common input line (or
   lines) so that we don't have to make connections separately to
   each daughter board.
 - We need to discuss this with Roger and Kim at our next meeting.

5). FDC Budget:

 - We reviewed the FDC budget - Brian was brought up to date on the
   numbers that he should help to provide.  The accuracy level is
   30% for our purposes.
 - The budget is due to Elton and Curtis by Dec. 19.

6). Dummy Cathode Design:

   Roger has completed work on the dummy cathode plane.  Due to the
   $20k cost, we need Elton to sign off on this.

Minutes prepared by Daniel. Send any comments or corrections along.