Difference between revisions of "Monitoring System Requirements"

From GlueXWiki
Jump to: navigation, search
Line 3: Line 3:
 
! Characteristic !! LED/fibre !! LED/wire
 
! Characteristic !! LED/fibre !! LED/wire
 
|-
 
|-
| Dead/alive or on/off || || ≤ 15%
+
| Dead/alive or on/off || yes || yes
 
|-  
 
|-  
| Timing check/offset || || typically 100
+
| Timing check/offset || yes || yes
 
|-  
 
|-  
| Relative gain check || none (PRIMEX might have) || 150 pe on module
+
| Relative gain check || yes || yes
 
|-
 
|-
 
| Linearity check || align=center | ~3 ns || align=center | ≤ 2 ns
 
| Linearity check || align=center | ~3 ns || align=center | ≤ 2 ns
Line 14: Line 14:
 
|-  
 
|-  
 
| Tower row flashing || || 1<sup>o</sup> causes 3% gain change
 
| Tower row flashing || || 1<sup>o</sup> causes 3% gain change
 +
|-
 +
| Simultaneously flash both ends || || 1<sup>o</sup> causes 3% gain change
 
|-  
 
|-  
 
| Location of calibration input ||From front to monitor rad damage || light guide tapered side
 
| Location of calibration input ||From front to monitor rad damage || light guide tapered side
 
|-  
 
|-  
 
| Geometrical constraints || Approximately 90% of front 4x4 cm2 area available || packing of WC and LGs, LED fitting, cable routing
 
| Geometrical constraints || Approximately 90% of front 4x4 cm2 area available || packing of WC and LGs, LED fitting, cable routing
 +
|-
 +
| Cost || Approximately 90% of front 4x4 cm2 area available || packing of WC and LGs, LED fitting, cable routing
 
|}
 
|}
  

Revision as of 17:54, 8 December 2010

DRAFT Table of System Requirements and Comparison
Characteristic LED/fibre LED/wire
Dead/alive or on/off yes yes
Timing check/offset yes yes
Relative gain check yes yes
Linearity check ~3 ns ≤ 2 ns
Temperature stability 1o causes 3% gain change
Tower row flashing 1o causes 3% gain change
Simultaneously flash both ends 1o causes 3% gain change
Location of calibration input From front to monitor rad damage light guide tapered side
Geometrical constraints Approximately 90% of front 4x4 cm2 area available packing of WC and LGs, LED fitting, cable routing
Cost Approximately 90% of front 4x4 cm2 area available packing of WC and LGs, LED fitting, cable routing
  1. Comment: Time (and temperature) stability most important.
  2. Comment: Option of delivering a range of light intensities important (e.g. using various filter settings).
  3. Comment from Werner: The flexibility in the use of the LED would be very useful for the start counter. Christina: Still need to test stability.
  4. Questions to Matt: What uniformity could one expect from the plexiglass input system? How many fibers were used to pulse the plexiglass, i.e. how often were they spaced?
  5. Comment: Matt drew attention to an LED pulser by Paul Smith which might be a useful reference.