== Agenda ==
 
== Agenda ==
  
# Frame Assembly Phase.  
+
# Frame Assembly Phase. [http://www.jlab.org/~vgr/CDC%20Design%202010/]
 
## Endplates.
 
## Endplates.
 
## Inner Shell.
 
## Inner Shell.

Revision as of 14:22, 1 November 2010

Meeting Time and Place

Monday November 1, 2010 at 2:30pm At Jefferson Lab, the meeting will be held in room ARC 428

Connections

To connect from the outside, please use ESNET
1.) ESNET: 8542553
2.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 77438230# (remember the "#")

Meeting Purpose

This is a series of meetings to get the CDC drawings finalized and signed. The agenda is a list of all the parts needed in each phase of the project. The initial goal si to go through the first couple of phases and make sure that things are all completed here.

Agenda

  1. Frame Assembly Phase. [1]
    1. Endplates.
    2. Inner Shell.
    3. Support Rods.
  2. Straw Assembly and Installation Phase.
    1. Strawtubes.
    2. Aluminum Donuts.
    3. Aluminum Feed Thrus.
    4. Plastic Donuts.
    5. Plastic Feed Thrus.
  3. Outer-shell installation Phase.
    1. Internal Gas Plumbing.
      1. Gas lines.
      2. Installation position.
      3. Widgets to hold plumbing.
      4. Thermal Couples + wiring.
    2. Outer Shell Assembly.
      1. Outer-shell hubs.
      2. Outer-shell.
      3. Support units (bearings?)
  4. Wire Stringing Phase
    1. Wire (to be sent to CMU)
    2. Pin holders
    3. Crimp pins (tool setting)
  5. Electrical Connections Phase.
    1. Inner support hub.
    2. Outer support hub.
    3. Swiss-cheese plate.
    4. Wire holders (screw-in).
    5. Connection wires.
    6. Preamplifier supports.
    7. Soldering board.
    8. HV board.
  6. Down-stream gas plenum phase.
    1. Rohacell supports.
    2. Gas window.