Difference between revisions of "November 9, 2011 Tracking CDC/FDC"

From GlueXWiki
Jump to: navigation, search
(CDC Update)
Line 25: Line 25:
  
 
== CDC Update ==
 
== CDC Update ==
 +
#As of yesterday 92 straws were strung in layer 28, this is the last of the straight layers.  Next week we will move on to stereo, which will probably take a few days to prepare for, whilst the procedures are finalized and some extra assembly equipment modified (the alignment device).
 +
#The stringing work is interleaved with testing tension in the wires installed the previous week and performing repeat measurements on older wires.
 +
#Kait and Amy have been manufacturing hook up wires.
 +
#Gary is busy manufacturing the small pieces required for the swiss cheese plate.

Revision as of 12:25, 9 November 2011

_TOC__

Meeting Time and Place

Wednesday November 9, 2011 at 11:00am At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Agenda

  1. Announcements
  2. FDC Update logbook
  3. CDC Update

Minutes

Participants: Curtis, Naomi, Beni, Simon, Lubomir, Elton, Mark, Dave

FDC Update

CDC Update

  1. As of yesterday 92 straws were strung in layer 28, this is the last of the straight layers. Next week we will move on to stereo, which will probably take a few days to prepare for, whilst the procedures are finalized and some extra assembly equipment modified (the alignment device).
  2. The stringing work is interleaved with testing tension in the wires installed the previous week and performing repeat measurements on older wires.
  3. Kait and Amy have been manufacturing hook up wires.
  4. Gary is busy manufacturing the small pieces required for the swiss cheese plate.