m
Line 64: Line 64:
 
'''Chris discussed results of manpower meeting with Claus et al:'''
 
'''Chris discussed results of manpower meeting with Claus et al:'''
  
 +
* It seems clear that the DAQ and Electronics groups will meet milestones with their current manpower.
 +
* Tentative agreement to try to get funding for two new DAQ positions and one new Electronics position.
 +
* Hope is to label them "critical hires" to avoid hiring freeze.
 +
* Timeline for hiring not clear yet.
 +
* Of the DAQ group hires, one will work with Dave A, the other with Ed J.
  
  
 +
'''Dave Doughty discussed how to include the tagger in the trigger:'''
  
  
'''Dave Doughty discussed how to include the tagger in the trigger:'''
 
  
 
'''Elliott presented the list of online major milestones:'''
 
'''Elliott presented the list of online major milestones:'''

Revision as of 17:37, 17 December 2007

Agenda


Time/Location

2:00pm Fri 14-Dec-2007 Cebaf Center F326

To connect by telephone:

1) dial:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International

2) enter participant code: 39527048# (remember the "#")


Announcements

  • Minor rewording in Wiki pages: DAQ/Online/Controls ==> Trigger/DAQ/Monitoring/Controls.
  • Suggestion to form Hall D electronics pool.


Next Meeting

Next meeting will be in Jan, date TBD.


New Action Items from this Meeting

  • Add to online milestones document (Elliott):
    • more specific electronics milestones
    • demonstration of full crate-sum trigger readout
    • add dates for each milestone
  • Give Elke items for the Hall D Action Item Tracker (Elliott)
    • more detailed than major milestonen
    • include names, dates, etc.


Minutes

Attendees: Elliott W, Dave A, Chris C, Fernando B, Mark I, Elton S, Dave D, Ed J, Carl T, Simon T.


Chris Cuevas gave an update on electronics:

  • Many specs and drawings in draft state, prototypes are coming.
  • Manpower is a big problem given deadlines, esp. for the crate-sum module.
  • Two more 20-slot VXS crates on order.
  • Slightly behind on FADC October milestones, no full crate tests yet.
  • Hai will work on FADC after completing an Accelerator project.
  • New hire will arrive in Jan, will work on VXS backplane clock distribution.
  • Some discussion ensued concerning what must be demonstrated for the subsystem and CD-3 reviews.
    • critical items not yet demonstrated.
  • More discussion about subsystem review May 2008, scope is what has not been previously reviewed (Trigger, DAQ, etc).
    • CD-3 (Lehman) review will view reports of other subsystem reviews, but likely will not probe more deeply.


Chris discussed results of manpower meeting with Claus et al:

  • It seems clear that the DAQ and Electronics groups will meet milestones with their current manpower.
  • Tentative agreement to try to get funding for two new DAQ positions and one new Electronics position.
  • Hope is to label them "critical hires" to avoid hiring freeze.
  • Timeline for hiring not clear yet.
  • Of the DAQ group hires, one will work with Dave A, the other with Ed J.


Dave Doughty discussed how to include the tagger in the trigger:


Elliott presented the list of online major milestones: