Difference between revisions of "Oct 14, 2010 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 35: | Line 35: | ||
=Minutes= | =Minutes= | ||
− | ''Attendees: | + | ''Attendees: Christina, Pavlos, George (Athens); John, Elton, Fernando, Beni, Tim, Yi, Eugene (JLab); Matt (IU). |
+ | |||
+ | # Calibration | ||
+ | ## Trapezoidal Lightguide [http://kronos.phys.uregina.ca/~zisis/TrapsGuide_2010-10-15.ppt Traps Guide] (Athens) | ||
+ | ## Calibration/Monitoring page: [[Monitoring R&D]] | ||
+ | # Announcements | ||
+ | #* Change of meeting time? | ||
+ | # Review of Action Items | ||
+ | # FCAL | ||
+ | ## Construction Status | ||
+ | ## CW Base Update [http://dustbunny.physics.indiana.edu/~mashephe/pmt_slides.pdf Slides] | ||
+ | # BCAL | ||
+ | ## Construction Status | ||
+ | # [[SiPM Radiation Hardness Test | SiPM update]] | ||
+ | # Simulations | ||
+ | # Other Updates |
Revision as of 14:12, 14 October 2010
Teleconference Time: 11:00 a.m. EDT
- ESNET and EVO session
- Phone in CC F326 is 757-269-6337
- Phone in the Regina Videoconference Suite is 306-585-4204
- Phone only if requested:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone line by request only.
Items for followup from previous meeting(s)
- Monitoring
- SiPMs
- IU: geometry for summed units
- JLab: Complete testing of radiation damage to sensors, temperature dependence, etc.
Tentative Agenda
- Calibration
- Trapezoidal Lightguide Traps Guide (Athens)
- Calibration/Monitoring page: Monitoring R&D
- Announcements
- Change of meeting time?
- Review of Action Items
- FCAL
- Construction Status
- CW Base Update Slides
- BCAL
- Construction Status
- SiPM update
- Simulations
- Other Updates
Minutes
Attendees: Christina, Pavlos, George (Athens); John, Elton, Fernando, Beni, Tim, Yi, Eugene (JLab); Matt (IU).
- Calibration
- Trapezoidal Lightguide Traps Guide (Athens)
- Calibration/Monitoring page: Monitoring R&D
- Announcements
- Change of meeting time?
- Review of Action Items
- FCAL
- Construction Status
- CW Base Update Slides
- BCAL
- Construction Status
- SiPM update
- Simulations
- Other Updates