Difference between revisions of "Oct 29, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
(Items for followup from previous meeting(s))
Line 9: Line 9:
  
 
=Items for followup from previous meeting(s)=
 
=Items for followup from previous meeting(s)=
# Fcal
 
#* Need to discuss strategy for fabrication of boards. Paul is concerned primarily about the HV board. We should include Fernando and Chris on the discussion for suggestion of production.
 
#* <strike> CR to modify schedules for new activities, including Fcal calibration. Elton to send proposal to listserver for comments. </strike>
 
 
# Bcal
 
# Bcal
 
#* Web page needs to be setup for communications.  
 
#* Web page needs to be setup for communications.  
 
#* Decide on a strategy for how to use fibers with slightly different systematics into matrix construction (e.g. randomizing them in the matrix). (everyone)
 
#* Decide on a strategy for how to use fibers with slightly different systematics into matrix construction (e.g. randomizing them in the matrix). (everyone)
 
# Bcal readout
 
# Bcal readout
#* Review decision on the orientation of FM pmt relative to Bfield, including tolerances due to expected field changes. (Elton, Will, Alam, Pedro)
 
#* <strike> Alam will see if Pedro can generate new orientations of the pmts at an angle of 15 deg relative to the B field. </strike>
 
 
#* Should order prototype light guides for typical configurations
 
#* Should order prototype light guides for typical configurations
  

Revision as of 17:46, 15 October 2009

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Bcal
    • Web page needs to be setup for communications.
    • Decide on a strategy for how to use fibers with slightly different systematics into matrix construction (e.g. randomizing them in the matrix). (everyone)
  2. Bcal readout
    • Should order prototype light guides for typical configurations

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
  4. Fcal
  5. Bcal
    • Status of construction / Readiness Review Schedule
    • Fibre QA: Shipments 1-5 (GlueX-doc-1366)
  6. BCAL Readout
  7. Other business

Minutes

Attendees: