Offline Monitoring Data Validation

From GlueXWiki
Revision as of 16:58, 11 March 2016 by Sdobbs (Talk | contribs)

Jump to: navigation, search

This page contains the procedure for checking if production runs are of good quality and can be used for physics analysis.

Run Periods

RunPeriod-2016-02 Validation

Procedure

For each production run, do the following:

  • Go to the | Offline Run Browser page.
  • Follow the steps outlined in the checklist below.
  • Certify that each section is okay
    • (DB + script to be developed)
  • Set run status = 1 in RCDB
    • (script provided)

Checklist

  • BCAL
    • Check ...
  • CDC
    • Check ...
  • FCAL
    • Check ...
  • FDC
    • Check ...
  • PS
    • Check ...
  • SC
    • Check ...
  • TAGH
    • Check ...
  • TAGM
    • Check ...
  • TOF
    • Check ...
  • RF
    • Check timing offsets - Reference: [link]
      • Should be centered around zero
  • Timing
    • Check Track Matched Timing - Reference: [link]
    • Check Tagger/RF Timing - Reference: [link]
    • Check Tagger/SC Timing - Reference: [link]
  • Analysis
    • Check ...