Difference between revisions of "Online Action Items"

From GlueXWiki
Jump to: navigation, search
m
m
Line 13: Line 13:
 
* Online/Controls milestones - Elliott, 19-Jul-2007
 
* Online/Controls milestones - Elliott, 19-Jul-2007
 
* Design document listing basic requirements and design goals - Elliott, 19-Jul-2007
 
* Design document listing basic requirements and design goals - Elliott, 19-Jul-2007
** Needs results of event size study
+
** Needs results on event size, study group formed 20-Sep-2007
  
  
 
==Completed Action Items==
 
==Completed Action Items==
  
* DAQ milestones - Elliott, 19-Jul-2007
+
* DAQ milestones - Elliott, 19-Jul-2007, completed 15-Aug-2007
* Create task-oriented list of OWG responsibilites instead of existing group-oriented list - Elliott, 15-Jun-07
+
* Create task-oriented list of OWG responsibilites instead of existing group-oriented list - Elliott, 15-Jun-07, superceded 9-Aug-2007
 
** Instead, create work breakdown in Contractor - 9-Aug-2007
 
** Instead, create work breakdown in Contractor - 9-Aug-2007
 
* Replace "GlueX" with "Hall D" in wiki pages - Elliott, 15-Jun-07, completed 20-Jun-07
 
* Replace "GlueX" with "Hall D" in wiki pages - Elliott, 15-Jun-07, completed 20-Jun-07

Revision as of 13:35, 25 September 2007

Open Action Items

  • Determine requirements for and set up CODA-based Electronics group test stands - Elliott W, Chris C, Dave A, 9-Aug-2007
  • DAQ board specifications needed by Electronics group - Dave A, 9-Aug-2007
  • Milestones from JLab Electronics Group - Chris C, 9-Aug-2007
  • Milestones from JLab DAQ group - Graham H, 19-Jul-2007


Action Items In Progress

  • Committee formed to lead effort to determine event size - Elliott, 29-Aug-2007
  • DAQ/Online/Controls work breakdown - Elliott, 9-Aug-2007
  • Online/Controls milestones - Elliott, 19-Jul-2007
  • Design document listing basic requirements and design goals - Elliott, 19-Jul-2007
    • Needs results on event size, study group formed 20-Sep-2007


Completed Action Items

  • DAQ milestones - Elliott, 19-Jul-2007, completed 15-Aug-2007
  • Create task-oriented list of OWG responsibilites instead of existing group-oriented list - Elliott, 15-Jun-07, superceded 9-Aug-2007
    • Instead, create work breakdown in Contractor - 9-Aug-2007
  • Replace "GlueX" with "Hall D" in wiki pages - Elliott, 15-Jun-07, completed 20-Jun-07