Difference between revisions of "Photon Beam Commissioning Discussion July 16, 2014"
From GlueXWiki
(→Action Items) |
(→Action Items) |
||
Line 16: | Line 16: | ||
* Send link to accelerator commissioning procedure (Mike) | * Send link to accelerator commissioning procedure (Mike) | ||
* Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard) | * Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard) | ||
+ | * Todd will provide the magnetic field of the quadrupole immediately upstream of the tagger magnet (Todd) | ||
== Agenda == | == Agenda == |
Revision as of 09:10, 10 July 2014
Organization
- Time: 4 pm EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
References
Action Items
- Send link to accelerator commissioning procedure (Mike)
- Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard)
- Todd will provide the magnetic field of the quadrupole immediately upstream of the tagger magnet (Todd)
Agenda
- Announcements
- Electron Commissioning (Todd/Mike)
- Photon Commissioning Draft (Eugene)
- Goals for Aug 8 Review
- Other business
Minutes
- Attending: