Photon Beam Commissioning Discussion July 29, 2014

From GlueXWiki
Revision as of 14:53, 28 July 2014 by Elton (Talk | contribs) (Agenda)

Jump to: navigation, search

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Sasha defined geometry, Richard will add field map
  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
  • Prepare plan for placing the profiler monitor at collimator, target and beam dump (Hovanes)
  • Material for review due July 29: draft of presentations and all pre-brief material

Agenda

  1. Announcements
  2. Electron Beam Specifications - Need to confirm
  3. Electron Commissioning (Todd/Mike)
  4. Photon Commissioning Draft (Alexandre)
  5. Radiation monitors
  6. Aug 8 Review:
  7. Other business

Minutes

Attending: