Difference between revisions of "Photon Beam Commissioning Discussion Oct 8, 2014"

From GlueXWiki
Jump to: navigation, search
(Created page with "__TOC__ == Organization == * Time: 4:00 pm EST * Connecting: detailed instructions are here ** H.323 ip address: 199.48.152.152 ** web bro...")
 
(Action Items)
Line 17: Line 17:
 
* Screen of beam parameters for Hall D (Hovanes)
 
* Screen of beam parameters for Hall D (Hovanes)
 
* Feedback on accelerator on latest ICD draft (Michael, Todd)
 
* Feedback on accelerator on latest ICD draft (Michael, Todd)
 +
* List of variables from radiation monitors to Pavel (Hovanes and Alexandre)
  
 
== Agenda ==
 
== Agenda ==

Revision as of 17:48, 24 September 2014

Organization

  • Time: 4:00 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps
  • Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton)
  • Screen of beam parameters for Hall D (Hovanes)
  • Feedback on accelerator on latest ICD draft (Michael, Todd)
  • List of variables from radiation monitors to Pavel (Hovanes and Alexandre)

Agenda

  1. Announcements
  2. Accelerator and Hall D Interface Document - update
  3. Update on Photon Commissioning (Alexandre)
  4. Beam Simulations
  5. RadCon update
  6. Other business

Minutes

Attending: