Difference between revisions of "Photon Beam Commissioning Discussion Sep 3, 2014"

From GlueXWiki
Jump to: navigation, search
(Created page with "__TOC__ == Organization == * Time: 4 pm EST * Connecting: detailed instructions are here ** H.323 ip address: 199.48.152.152 ** web browse...")
 
(Action Items)
Line 12: Line 12:
 
== Action Items ==
 
== Action Items ==
  
* Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Richard is working to update the defined geometry based on [http://zeus.phys.uconn.edu/halld/tagger/tagger_vault.pdf a drawing received from Tim], Richard will add field map from Dan Sober
 
 
* Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
 
* Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
 
** Need rates for profiler, start counter, ps
 
** Need rates for profiler, start counter, ps
 
* Richard will provide a "sacrificial" board with 30 SiPMs to register neutron damage during initial electron beam tune.
 
* Richard will provide a "sacrificial" board with 30 SiPMs to register neutron damage during initial electron beam tune.
 
* Hovanes is preparing photomultipliers that can be used to measure beam loss along the beamline.
 
* Hovanes is preparing photomultipliers that can be used to measure beam loss along the beamline.
* Alexandre will meet with RadCon next week to coordinate details of accessing monitor information
 
  
 
== Agenda ==
 
== Agenda ==

Revision as of 08:45, 21 August 2014

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps
  • Richard will provide a "sacrificial" board with 30 SiPMs to register neutron damage during initial electron beam tune.
  • Hovanes is preparing photomultipliers that can be used to measure beam loss along the beamline.

Agenda

  1. Announcements
  2. Recommendations from ERR Report
  3. Aug 8 Photon Beam Commissioning Review Final Report
  4. ARR presentations
  5. Accelerator and Hall D Interface Document - needs to be finalized.
  6. Update on Photon Commissioning (Alexandre)
  7. Beam Simulations
  8. RadCon update
  9. Other business

Minutes

Attending: