== Organization ==
 
== Organization ==
* Time: 4 pm EST
+
* Time: 4:15 pm EST
 
* Connecting: detailed instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: detailed instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
** H.323 ip address: 199.48.152.152
 
** H.323 ip address: 199.48.152.152

Revision as of 10:41, 17 September 2014

Organization

  • Time: 4:15 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps
  • Complete the tagger drawing with the expected configuration for the fall running, including all shielding. (Tim, Chuck, Elton)

Agenda

  1. Announcements
  2. Accelerator and Hall D Interface Document - update
  3. Update on Photon Commissioning (Alexandre)
  4. Beam Simulations
  5. RadCon update
  6. Other business

Minutes

Attending: