== Runplan time charts==
 
== Runplan time charts==
'''Commissioning time chart''':      [[File:Fall17_week1.jpg|70px|thumb|center|  ]]
+
 
 +
'''Commissioning time chart''':      [[File:Fall17_3day_rp.jpg|70px|thumb|center|  ]]
 +
Commissioning time chart. The horizontal scale is the time during which beam is available (in other word, it would be the real time with 100% of beam efficiency). The task time estimates given on the plot have 100% contingency.
 +
 
 +
<!--'''Commissioning time chart''':      [[File:Fall17_week1.jpg|70px|thumb|center|  ]]
 
Commissioning time chart. Week 1. The horizontal scale is the time during which beam is available (in other word, it would be the real time with 100% of beam efficiency). The task time estimates given on the plot have 100% contingency.
 
Commissioning time chart. Week 1. The horizontal scale is the time during which beam is available (in other word, it would be the real time with 100% of beam efficiency). The task time estimates given on the plot have 100% contingency.
  
 
[[File:Fall17_week2.jpg|70px|thumb|center|  ]]
 
[[File:Fall17_week2.jpg|70px|thumb|center|  ]]
Commissioning time chart. Week 2.  
+
Commissioning time chart. Week 2. -->
  
 
----
 
----

Revision as of 17:52, 18 December 2017

Meeting General Agenda

Connect Information

To connect from the outside by phone please do the following

1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.

2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.

3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.

4.) The moderator code is 8394

Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Specific instructions for connecting from JLab's Hall D conference room:

  • Turn polycon on if necessary (do it before turning the computer on)
  • With the polycon, place a call at 199.48.152.152
  • Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
  • You may have to unmute the microphone: #*4
  • Turn the computer on if needed

Beam and Hall configuration

  • Beam energy expected: 11.640 GeV (Same value as Fall 2016 and Spring 2017).
  • Solenoid on at 1350A. Any field changes should be avoided if possible.
  • CW Beam current:
    • Range: 1 nA-1.5 μA. 250 MHz frequency.
    • Standard production running expected at ~200 nA on 4·10-4 R.L. radiator.
    • RSAD limit for most of the run, excluding high intensity tests: 250 nA on 4·10-4 R.L. radiator.
  • FFB on or Position Slow Lock on (FFB doesn't operate below 50nA).
  • Radiators:
    • Goniometer diamond radiators:
      • J1a50       (50 μm - 4.1·10-4 R.L., 4×4 mm²) - old crystal - excellent rocking curve
      • JD70-100 (58 μm - 4.8·10-4 R.L., 7×7 mm²) - new crystal - excellent rocking curve
      • JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) - new crystal - good rocking curve
      • JD70-104 (17 μm - 1.4·10-4 R.L., 7×7 mm²) - new crystal - wider rocking curve - marginally usable
    • We also have one 10 μm Al radiator.
    • Amorphous
      • 1.5 µm Al (1.7·10-5 R.L.)
      • 10 µm Al (11.2·10-5 R.L.)
      • 30 µm Al (33.7·10-5 R.L.)
  • Tagger quadrupole on (-4.2 A).
  • Collimator hole: Both 5 mm diameter and 3.4 mm diameter. Default running: 5.0 mm

General Information

This document describes the run plan for the Hall D Fall 2017 and Spring 2018 run.

  • Schedule for the run:
  1. Nov. 27th-Dec. 1st: Electron beam restoration
  2. Dec. 1st-Dec. 21st: Hall D Fall run.
  3. Dec. 21st-Jan. 8th: Xmas break. (Solenoid will be ramped down but kept cool)
  4. Jan. 9th-Jan. 11th: Electron beam restoration
  5. Jan. 12th-Mar. 23rd: Hall D Spring run.
  1. Every Tuesdays: 12h of beam study. Every Thursdays, if necessary: 8h of RF recovery.
  • Accelerator overall plan and priorities:
  1. Deliver physics beam to 4 halls.
  • Experiment: GlueX E12-06-102 Production
  • Planned tests (Accelerator, related to Hall D):
  • Test nA BPM and stripline BPM.
  • Test fast raster operation.
  • Evaluate Rapid Access. Rapid access will be evaluated in Fall and, if successful, will be available for use in Spring. Information on Rapid Access for this run (from T. Whitlatch)
  • Planned tests (Hall D):
    • Align JD70-104 (17 μm - 1.4·10-4 R.L., 7×7 mm²) (Hovanes) and take enough data to achieve ~1% statistic on rho polarimetry (less than a shift at 600 nA).
    • If simulation available: Fast raster beam characterization (R. Jones) Will necessitate high-current (??h)
    • Beam halo measurements to assess background for PRad target TAC runs. (A. Deur/Hovanes/A. Somov 1h×2)
    • High-intensity GlueX L1 tests (A. Somov) (2 instances of 2h separated by a day, I≈500nA)
    • High-intensity GlueX DAQ tests (S. Furletov) (2 instances of 2h separated by a day, I≈500nA)
    • TAC V-wire commissioning (Hovanes) (3h)
    • If simulation available: Systematic TAC study:runs with different materials in the photon beam line. (A. Somov ??h)
    • If simulation available: Systematic PS acceptance study with collimator pos. offset (A. Somov ??h)
    • CDC and FDC HV scans (L. Penchev, Beni Z.)(4h×2)
    • CDC and FDC readout tests (N. Jarvis, 1h)
    • ToF non-linearity test (Beni Z., S. Furletov) (1h×2 Separated by a few days)
    • Microscope yield study (Richard/Jim McIntyre/Alex Barnes, 1h)
    • Muon chamber test (parasitic?) (E. Smith)
    • TRD test (parasitic) (S. Furletov, L. Penchev)


  • Expected Staffing and responsibilities:
    • The Run Coordinator oversees the commissioning:
      • Nov. 27th-Dec. 1st, 5 days: A. Deur (accelerator restoration)
      • Dec. 1st-Dec. 21st, 20 days: A. Deur
      • Xmas break.
      • Jan. 9th-Jan. 11th, 3 days: A. Deur (accelerator restoration)
      • Jan. 12th-Jan. 24th, 12 days: A. Deur
      • Jan. 24th-Jan. 31st, 7 days: Sasha Ostrovidov
      • Jan. 31st-Feb. 7th, 7 days: Justin Stevens
      • Feb. 7th-Feb. 14th, 7 days: Mark Dalton
      • Feb. 14th-Feb. 21st, 7 days: Alex Barnes
      • Feb. 21st-Feb. 28th, 7 days: Zisis Papandreou
      • Feb. 28th-March 7th, 8 days: Cristiano Fanelli
      • March 7th-March 14th, 7 days: Richard Jones
      • March 14th-March 22nd, 8 days: Naomi Jarvis


Runplan

  1. Verify electron beam quality and establish photon beam (assume 1 day).
    • Ion Chambers trip threshold must be set using Al. radiators
    • Tune electron beam with radiator retracted
      • Radiator (amorphous and diamond) must be retracted. Collimator should be in blocking position.
        • Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 50 nA)
          • RAD102_P1 ~ 10 mrad/hr (tagger area, gammas, between tagger and dump)
          • RAD102_P2 ~ 0.1 mrad/hr (tagger area, gammas, on the goniometer).
          • RAD102_P3 ~ 0.3 mrem/hr (tagger area, neutrons, near electronics racks)
          • RAD508_P1 < 0.1 mrad/hr (collimator cave, gammas).
          • RAD508_P2 ~ 0. mrad/hr (Hall. Neutrons).
      • Hall D tagger CARMS, Ion Chamber and BLM threshold for beam trips should not be changed without approval of Hall D leader.
    • Establish good photon beam
    • Make sure tagger quadrupole is on and at -4.2 A. (It can be turned on only once the Hall is n power/beam permit.)
      • Insert 2*10-5 RL radiator. Call MCC and ask to mask the FSD and turn off beam each time a radiator is moved
        • Typical levels are (for 2×10-5 radiator, electron beam current 50 nA)
          • RAD102_P1= 35 mrad/hr (tagger area, gammas, between tagger and dump)
          • RAD102_P2= 0.5 mrad/hr (tagger area, gammas, on the goniometer)
          • RAD102_P3= ~2 mrem/hr (tagger area, neutrons, near electronics racks)
          • RAD508_P1= ~10 mrad/hr (collimator cave, gammas).
          • RAD508_P2 < ~ 0. mrad/hr (Hall. Neutrons).
    • Verify beam position and envelope.
      • Ask MCC for 5C11 and 5C11B HARP. Then do our radiator HARP scan, see instruction. If it looks good, proceed to next step. Otherwise, inform MCC.
      • Insert profiler (no need for masking FSD when an object is inserted in the photon line), run with 10×10-4 radiator and 50 nA. Beam on the profiler should be at x=0.0±0.5cm; y=0.0±0.5cm. If not, inform MCC.
    • Radiation level study (1h):
      • Run 5 min without radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA. Repeat at 100 nA and 200 nA
      • Run 5 min with the 10-4 radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
      • Run 3 min with the 3*10-4 radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
    • Microscope yield study (row-by-row scan). (Richard/Jim McIntyre/Alex Barnes, 1h)
      • Call Richard Jones 20 min before the start of this task. Call Alex Somov to set-up the PS trigger.
      • Insert 5mm collimator.
      • Procedure to follow
      • Any type of beam quality will do.
      • 10-4 radiator, 10-3 convertor, 80 nA beam current.
    • Active Collimator calibration. (20 + 20 mins). Call Hovanes.
      • re-Insert the 10-4 radiator (Call MCC). Use about 100 nA beam current. This will provide the Act. Col. nominal positions for its high gain values.
      • Determine maximum photon beam transmission by doing 2D scans using the collimator x/y motions (Hovanes. 1h)
      • Repeat procedure with 2*10-5 radiator (Call MCC) and 50 nA beam current. This will provide the Act. Col. nominal positions for its low gain values.
      • Record on the white board what is the beam position on 5C11b and Active Collimator for optimal photon transmission, both for low and high Act. Col. gain.
      • Until Hovanes determines to optimal 5C11b and Active Collimator position, keep profiler in and beam locked (MCC's duty) on the nominal 5C11b and x=0,y=0 profiler position. Once Active Collimator nominal beam position is known, retract profiler and lock the beam (MCC) on the active collimator.
  2. Detector and beamline checkout.
    • Reestablish L1 trigger Alex. Somov. 3h).
    • Reestablish DAQ (Sergei, 2h).
    • General detector calibration (Sean Dobbs. 8h). Use 10-4 radiator.
      • Run 15 min in Long Mode.
    • CDC and FDC HV scans (1) (L. Penchev, Beni Z.)(4h×2)
    • From here on, the tasks below are interspersed with data production
  3. Realign 60 μm diamond (JD70-100) for the 4 polarization configuration (Hovanes, Paul Mattione. 16h/diamond).
  4. Beam background measurements for PRad target TAC runs. (A. Deur/Hovanes/A. Somov) 10-250nA, no radiator, TAC in, target full. 1h. Several runs throughout Fall/Spring run periods.
  5. Straight track run (16h, nominally at the end of the Fall run. Otherwise, end of Spring run) (Lubomir)
    • Ramp down solenoid magnet (8h)
    • Take straight track run data (Lubomir)
  6. Gluex data production
    • Log in run information in the shift summary (make a run list). For each production run, log useful comments on DAQ comment window, see [2]
    • Tagger quadrupole on
    • Harp scans once a day: 15 min.
    • If commissioning and analysis were successful, once a day (?), a beam envelope measurement by rastering on Act. Col. ??min
    • Empty target run every 3 week (2h: 1- h to empty/fill back the target, 1h running). Standard production current.
    • Long mode 10 min run. Once a week (20 min).
    • Amorphous run. Every set of 4 diam. orientation runs. 1h Standard production current. Time to switch from pol. to unpol.: 10min. time to switch from unpol. to pol.: 30min.
    • TAC commissioning, systematic studies and runs. (Hovanes, Alex Somov 2 days.)
      • V-wire commissioning.
      • Move around the collimator with 1mm plug to see effect on TAC. Do 4 different positions.
      • Check effect of material on γ-beam path on TAC: for ex. fill the target (30 min to fill or empty target).
      • Do a TAC run without solenoid field to test GEANT TAC simulation in simpler conditions. (To be done around straight-track runs).
    • Physics production data with diamonds and 5 mm hole. Ratio of para./transverse/45o/135o data:25/25/25/25. 2h runs and no more, as it may be hard to correct for calibration drifts. Switch polarization every run. Time to switch: 10min. DAQ start run overhead: 3min.
      • Luminosity:
        • Run at about 200 nA (for 60 μm diamond JD70-100).
  1. Parasitic muon chamber
  2. Parasitic TRD run

Hall D situation room (current run plan)

Hall D counting room white board

Runplan time charts

Commissioning time chart:
Fall17 3day rp.jpg

Commissioning time chart. The horizontal scale is the time during which beam is available (in other word, it would be the real time with 100% of beam efficiency). The task time estimates given on the plot have 100% contingency.



Accelerator status

Hot Checkout

  1. Hot Check OUT Status 100% ready ; 0% checked ; 0% not ready

Readiness for Fall 17-Spring18 run

(This section is commented out for clarity)