Difference between revisions of "Run Coordination Meetings:Summer2020"

From GlueXWiki
Jump to: navigation, search
(Created page with "===Summer 2020 GlueX Run=== <!--[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=578563767 Run Statistics]--> Run Statistics Googl...")
 
(Beam and Hall configuration)
 
(110 intermediate revisions by 7 users not shown)
Line 3: Line 3:
  
 
== Meeting General Agenda ==
 
== Meeting General Agenda ==
[[Run Planning Meeting Notes, July 27-August 5, 2020]]<br/>
+
 
 +
[[Run Planning Meeting Notes, July 27-August 5, 2020]]
 +
 
 +
[[Run Planning Meeting Notes, August 6 - 12, 2020]]
 +
 
 +
[[Run Planning Meeting Notes, August 13 -17, 2020]]
 +
 
 +
[[Run Planning Meeting Notes, August 20-26, 2020]]
 +
 
 +
[[Run Planning Meeting Notes, August 27-September 2, 2020]]
 +
 
 +
[[Run Planning Meeting Notes, September 3 - 9, 2020]]
 +
 
 +
[[Run Planning Meeting Notes, September 10 - 16, 2020]]
 +
 
 +
[[Run Planning Meeting Notes, September 17 - 21, 2020]]
  
 
==Connect Information==
 
==Connect Information==
Line 35: Line 50:
 
* CW Beam:  
 
* CW Beam:  
 
** 250 MHz frequency.  
 
** 250 MHz frequency.  
** Range: 1 nA-2100 nA. (High current required for short Tagger Accidental study)
+
** Range: 1 nA-900
** Chopper slit: shared with Hall C, then use A slit when Hall A is done (03/26/2020).
+
** Chopper slit: With Hall C until Sept. 3rd (always at 5 passes). Then, with Hall A (Hall A: one pass always until Sept. 3rd. Then off.) Note: Hall B at 1 pass for the first 4 days, then, at 5 pass until the end of the run.
 
**Standard current and radiators
 
**Standard current and radiators
***~300 nA on a 4.1&middot;10<sup>-4</sup> R.L. radiator (50 μm diamond). (RSAD limit 500nA on 58 μm diamond))
+
***~350 nA on a 4.1&middot;10<sup>-4</sup> R.L. radiator (50 μm diamond). (RSAD limit 500nA on 58 μm diamond))
***~360 nA  on a 33.7&middot;10<sup>-5</sup> R.L. AL radiator (30 &micro;m Al). (RSAD limit 600nA on 30 &micro;m Al radiator))
+
***~350 nA  on a 33.7&middot;10<sup>-5</sup> R.L. AL radiator (30 &micro;m Al). (RSAD limit 600nA on 30 &micro;m Al radiator))
 
* Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).   
 
* Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).   
 
* Radiators:  
 
* Radiators:  
**Goniometer radiators: DIRC commissioning starts on 40 μm Al radiator. Then it uses production diamond.
+
**Goniometer radiators:  
***Diamond JD70-103 (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - good rocking curve. Aligned and shortly used during Fall 2019/Spring 2020
+
***Diamond JD70-103 (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - Not expected to be good according to rocking curve.  
***Diamond JD70-105 (47 μm - 3.9&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - Used for the second part of GlueX's Fall 2018 run and Fall 2019/Spring 2020.  Good performance.  
+
***Diamond <font color="red">JD70-105 </font> (47 μm - 3.9&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - Used for the second part of GlueX's Fall 2018 run and Fall 2019/Spring 2020.  Good performance.  
***Diamond JD70-106 (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - good rocking curve
+
***Diamond JD70-106 (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - Aligned and used shortly during Tagger Accidental test in Spring 2020. Did not display sharp coherent peak.
***Diamond JD70-107 (55 μm - 4.6&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - good rocking curve  
+
***Diamond JD70-107 (55 μm - 4.6&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - Not expected to be good according to rocking curve.
***Diamond JD70-109 (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - good rocking curve  
+
***Diamond JD70-109 (50 μm - 4.1&middot;10<sup>-4</sup> R.L., 7&times;7 mm&sup2;) - new crystal - Not expected to be good according to rocking curve.
 
***Amorphous 40 μm Al radiator (44.9&middot;10<sup>-5</sup> R.L.)   
 
***Amorphous 40 μm Al radiator (44.9&middot;10<sup>-5</sup> R.L.)   
 
***V-wire (for TAC run).
 
***V-wire (for TAC run).
Line 57: Line 72:
 
*Tagger quadrupole on (-4.2 A).  
 
*Tagger quadrupole on (-4.2 A).  
  
* Collimator hole: Both 5 mm diameter and 3.4 mm diameter. <b>Default running: 5.0 mm.</b>
+
* Collimator hole: Default running: 5.0 mm. <!--Both 5 mm diameter and 3.4 mm diameter. -->
  
 
* Targets:  
 
* Targets:  
Line 65: Line 80:
  
 
* PS converter:  75 μm
 
* PS converter:  75 μm
 
*Absolute luminosity calibration:
 
**TAC partially cured for and installed. Divider problem fixed.
 
**ComCal installed and can be used instead of TAC. 
 
  
 
* Miscellaneous:
 
* Miscellaneous:
** Tracking device (2 Transition Radiation Detector(TRD, one wire-based, 1 GEM-based)+3 GEM)
+
** PS test area:
***<strike> In front of lower DIRC box during DIRC commissioning.
+
***Left arm: TRD and 12 calorimeter crystals to be tested
***Will be placed at three different locations during DIRC commissioning. Access necessary to move them to new position. (Solenoid field does <b>not</b> need to be ramped down.) 3h is necessary to move GEM/TRD from one location to the next (ideally done during beam study/RF recovery).</strike>
+
***Right arm: scintillator calorimeter to be tested
***Will be moved in the Pair Spect. area during Spring run.
+
** DIRC installed.
** Pair Spect. area: FCal Pb-W cristal testing/Hall C scintillator glass testing
+
**Other?
**EIC aerogel test? If ready. Will be behind the GEM/TRD
+
**Fiber test for profiler prototype (Regina)?
+
  
 
==General Information==
 
==General Information==
  
This document describes the run plan for the Hall D Fall 2019-Spring 2020 run.  
+
This document describes the run plan for the Hall D Summer 2020 run.  
* Schedule for the run:
+
* Schedule for the run (see [https://www.jlab.org/exp_prog/experiment_schedule/2020/Web20200619.3c.pdf July 2020-Dec. 2021 official schedule]):
# Nov. 18th - 24th: Electron beam restoration.
+
# July 13th - July 26th: Electron beam restoration.
# Nov. 25th - Dec. 19th: 2 PAC-weeks for DIRC Commissioning <font color="blue">(Solenoid at nominal field. LH2 target)</font>)
+
# July 27th - Sept.6th: 6  weeks for GlueX high luminosity production.  
# Dec. 20th -Jan. 2nd: Xmas break.
+
# Jan. 3rd - 9th: Electron beam restoration. <font color="red">(Same condition as Fall ⇒ It is not unreasonable to imagine it to be faster). This was the case for the Fall17-Spring18 run where the Xmas break was also very short.</font>)
+
#*Counting room will be staffed (Standby).
+
#*If time allows, the GEM/TRD will be moved to PS location (lower priority than GlueX production if we have an early start).
+
# Jan. 10th -May 6th: GlueX high luminosity production.  
+
  
* Nominally, every Mondays: 12h of beam study. Every Tuesdays, if necessary: 8h of RF recovery.
+
<!--* Nominally, every Mondays: 12h of beam study. Every Tuesdays, if necessary: 8h of RF recovery.-->
  
* Accelerator overall plan and priorities:
+
* Accelerator overall plan and priorities: Finish Spring run 2020 cut short by pandemic.
**Deliver physics beam to 4 halls. (Hall A stop early, on March. 26th. Halls B and or C will always be at 5th pass (except for 2×2 days for Hall C), so Hall D beam will always be RF-separated.)
+
**Deliver physics beam to 4 halls. <!--(Hall A stop early, on March. 26th. Halls B and or C will always be at 5th pass (except for 2×2 days for Hall C), so Hall D beam will always be RF-separated.)-->
  
 
*Hall D plan
 
*Hall D plan
** Experiment: GlueX [https://misportal.jlab.org/mis/physics/experiments/searchProposals.cfm?paramHall=D&paramExperimentEnergy=12GeV&paramExperimentStatusList=A,G E12-06-102] Production
+
<!--** Experiment: GlueX [https://misportal.jlab.org/mis/physics/experiments/searchProposals.cfm?paramHall=D&paramExperimentEnergy=12GeV&paramExperimentStatusList=A,G E12-06-102] -->
**<strike> Straight track run:
+
**Experiment: GlueX-II [https://misportal.jlab.org/mis/physics/experiments/viewProposal.cfm?paperId=834 E12-12-002]
*** At the very beginning of the Fall run.
+
**This run period is short (6 weeks). To make the acquired data set worth analyzing: maximize production, do only crucial tests.  
***Done for each of the 3 positions of GEM/TRD
+
**One TAC runs synchronized with test of new FCal divider.  
***Overall, one night of good data.
+
**Two empty target runs (One at the start of the run, the other consecutive to TAC run)
***⇒ overall about one calendar day: 14h of data (assumes 60% efficiency) + 4h for moving GEM/TRD + 8h solenoid ramp-up.
+
<!--** Straight track run?
** [https://halldweb.jlab.org/wiki/index.php/Fall_2019_DIRC_Commissioning DIRC commissioning page] (+TRD/GEM).
+
***Overall, one night of good data. -->
** DAQ:
+
**Trigger test for the SRC experiment
***new CODA 4h at higher intensity than standard.
+
**CPP trigger test.   
***cDAQ 4h at higher intensity than standard.
+
***Data consistency check (parasitic).
+
** Trigger  tests:
+
***FCal-BCal-ST trigger test/preparation for hifi current DAQ test: 1 shift
+
***High intensity (i.e. nominal for this run) trigger needs tuning at each increase of the beam current until nominal high intensity is reached.
+
**HV scans for TOF's new counters.</strike>
+
**Tagging accidentals beam tests (Richard Jones, Beni,Todd Satogata, Mike McCaugh) 2×shifts + tests during beam studies.
+
***Mott area study by CEBAF staff. Done during beam studies. Hall D may be open.
+
***[https://halldweb.jlab.org/wiki/index.php/Tagger_accidentals_rate_scan,_Fall_2019 High rate tagging test]: 1 shift: 3h of data taking at 100% efficiency+overhead.
+
****To be done twice. <strike>Once at the start of Fall, once</strike> during Summer run.
+
****<strike>First iteration: to be done after straight track runs when the solenoid is ramping-up.</strike>
+
****8 rate scans from 3kHz to 50kHz PS rates.
+
****Beam current 125 to 2100 nA</font> on 40m Al. amorphous radiator.
+
****PS trigger only.
+
****<font color="red">Target status: Empty per RadCon group request</font>, GlueX detector off, 5mm collimator, switch off all of TAGH.
+
****10M events for each run or more if rate is high: a run should not be less that 10 min.
+
****Can be followed by empty target run, since the target will be emptied for the test.
+
**ComCal test: anode current studies with special trigger (raw mode): 4h invasive.
+
** Pair. Spec. test area:
+
***Right arm (facing downstream): FCal Pb-W cristal quality and detector checks. Fully parasitic
+
***Left arm:
+
****EIC/Hall C aerogel tests. To be done before the glass-scintillator test below.
+
**** <strike>Fall 2019: Test of Hall C 3×3 block glass-scintillator prototypeFully parasitic</strike>
+
**** Spring 2020: TRD/GEM will be present after removal from in front of DIRC. Aerogel may be present. Fully parasitic
+
** CPP trigger tests: 1 shift + 2 shifts of installation/removal.
+
***<strike>End of Fall or beginning of January.</strike>
+
***Invasive.
+
***Installation/removal should be coordinated with beam study and RF recovery, to save a shift or two.
+
** Test fast raster beam envelope measurement with larger x-rastering (Todd Satogata/ Mike McCaugh/Richard Jones) <font color="red">Invasive but done during beam studies</font>
+
**Beamline, TAC platform: Fiber test for profiler prototype (Regina)? <font color="red">Fiber thickness info required in the RSAD</font>
+
  
 
* Expected Staffing and responsibilities:  
 
* Expected Staffing and responsibilities:  
 
**The Run Coordinator oversees the run:  
 
**The Run Coordinator oversees the run:  
*** <strike>Nov 18th-Nov 24th: 7 days: Alexandre Deur (accelerator restoration)
+
*** July 13th-July 26th: 14 days: Alexandre Deur (accelerator restoration)
*** Nov 24th-Dec 4th, 11 days: Alexandre Deur
+
*** July 27th-Aug. 5th, 10 days: Alexandre Deur  
*** Dec 4th-Dec 11th, 7 days: Naomi Jarvis
+
*** Aug 5th-Aug 12th, 7 days: Alexander Austregesilo
*** Dec 11th-Dec. 18th, 10 days: Wenliang Li
+
*** Aug 12th-Aug 19th, 7 days: Wenliang Li
*** Dec 18th-Dec. 20th, 3 days: Alexandre Deur
+
*** Aug 19th-Aug 26th, 7 days: Mark-Macrae Dalton
*** Jan 3rd-Jan 9th: 7 days: Alexandre Deur (accelerator restoration)
+
*** Aug 26th-Sept. 2nd, 7 days: Igal Jaegle
*** Jan 9th-Jan 15th, 7 days: Alexandre Deur
+
*** Sept 2nd-Sept 9th, 7 days: Keigo Mizutani
*** Jan 15th-Jan 22nd, 7 days: Jonathan Zarling
+
*** Sept 9th-Sept 16th, 7 days: Alexandre Deur
*** Jan 22nd-Jan 29th, 7 days: Alexander Austregesilo
+
*** Sept 16th-Sept 21st, 5 days: Igal Jaegle
*** Jan 29th-Feb 5th, 7 days: Alexander Ostrovidov
+
 
*** Feb 5th-Feb 12th, 7 days: Daniel Lersch
+
*** Feb 12th-Feb 19th, 7 days: Richard Jones
+
*** Feb 19th-Feb 26th, 7 days: Colin Gleason
+
*** Feb 26th-March 4th, 7 days: Wenliang Li
+
*** March 4th-March 11th, 7 days: Justin Stevens
+
*** March 11th-March 18th, 7 days: Richard Jones
+
*** March 18th-March 25th, 7 days: Mark Dalton
+
*** March 25th-Apr 1st, 7 days:  A. Deur </strike> <!-- Werner Boeglin -->
+
*** Apr 1st-Apr 8th, 7 days: <font color="red"> TBD </font>
+
*** Apr 8th-Apr 15th, 7 days: <font color="red"> TBD </font><!--Naomi Jarvis -->
+
*** Apr 15th-Apr 22nd, 7 days: <font color="red"> TBD </font> <!--Kenneth Livingston -->
+
*** Apr 22nd-Apr 29th, 7 days: <font color="red"> TBD </font>
+
*** Apr 29th-May 6th, 7 days:  <font color="red"> TBD </font><!--Joerg Reinhold -->
+
 
**The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (M. Stevens) verify that the proper safety rules are followed. PDL is:
 
**The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (M. Stevens) verify that the proper safety rules are followed. PDL is:
 
***PDL: Benedikt Zihlmann, Deputy PDL: Lubomir Penchev
 
***PDL: Benedikt Zihlmann, Deputy PDL: Lubomir Penchev
 
**The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data.  
 
**The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data.  
**Shifts: 2 persons per shift.
+
**Shifts: <font color="blue"> 1 person per shift. 4 shifts per day </font> [https://docs.google.com/spreadsheets/d/1znQG_AE8s9My28WZDchO-a_LHDBZosNyig6_jOzB0GQ/edit#gid=0 Shift Schedule Skeleton]
 
* Coordination Activities:
 
* Coordination Activities:
 
** The RC will attend the MCC meetings at 7:45am and 8:00am and the weekly MCC meeting (Wednesday, 1:30pm). The PDL will attend the weekly MCC meeting.
 
** The RC will attend the MCC meetings at 7:45am and 8:00am and the weekly MCC meeting (Wednesday, 1:30pm). The PDL will attend the weekly MCC meeting.
** Daily run meetings broadcasted on Bluejeans will occur at 8:45am in the counting house conference room. The Run Coordinator will be responsible for organizing and chairing the meeting.  
+
** Run meetings: broadcasted on Bluejeans. 8:45am in the counting house conference room. The Run Coordinator will be responsible for organizing and chairing the meeting.  
 +
*** Start of run: Daily meetings
 +
*** Production: <font color="blue"> Alternate nominal length meetings (Monday/Thursday) with short meetings (Tuesday, Wednesday, Friday)  </font>
 
* Useful links:
 
* Useful links:
**Accelerator schedule
+
**Accelerator schedule and information
 
***[https://www.jlab.org/exp_prog/experiment_schedule/2018/20181108.2.pdf Long term schedule]
 
***[https://www.jlab.org/exp_prog/experiment_schedule/2018/20181108.2.pdf Long term schedule]
 
***[https://accweb.acc.jlab.org/calendar/  Scheduled Accelerator Down (SAD)/Maintenance Calendar]
 
***[https://accweb.acc.jlab.org/calendar/  Scheduled Accelerator Down (SAD)/Maintenance Calendar]
 
***[http://accboard.acc.jlab.org/ http://accboard.acc.jlab.org/]  
 
***[http://accboard.acc.jlab.org/ http://accboard.acc.jlab.org/]  
 +
***[https://accweb.acc.jlab.org/presenter/pd-menu? PD weekly summary (also available from Accelerator's ELOG)]
 
**Link to Richard Jones program to plot the beam profile at the collimator.
 
**Link to Richard Jones program to plot the beam profile at the collimator.
 
***[http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi Harp extrapolation tool]
 
***[http://zeus.phys.uconn.edu/halld/cobrems/harptool.cgi Harp extrapolation tool]
 
**[https://halldweb.jlab.org/wiki/index.php/List_Run_Coordination_Meetings Links to previous runplans]
 
**[https://halldweb.jlab.org/wiki/index.php/List_Run_Coordination_Meetings Links to previous runplans]
 +
**Web-accessible EPICS information
 +
***[https://epicsweb.jlab.org/wedm/screen?edl=%2fcs%2fopshome%2fedm%2fdsg%2fhall_d%2foverview%2fgluex.edl Hall D EPICS summary screen from CSS]
 +
***[https://epicsweb.jlab.org/wedm/screen?edl=/cs/opshome/edm/wall/Status_W_Accel.edl Accelerator summary screen from CSS]
 +
***[https://epicsweb.jlab.org/wmenu/#HallDDetectorComponents-page Hall D detectors related EPICS screens]
 +
***[https://epicsweb.jlab.org/wmenu/#HallDMenu-page Hall D related accelerator screens epicsweb page]
 
** Links to beam parameters/radiation level monitoring:
 
** Links to beam parameters/radiation level monitoring:
 
***[https://www.jlab.org/accel/RadCon/opsgraphs/8h/halld_8h.pdf Last 8-hours plots showing 1-minute, 10-minute, and hourly averages]  
 
***[https://www.jlab.org/accel/RadCon/opsgraphs/8h/halld_8h.pdf Last 8-hours plots showing 1-minute, 10-minute, and hourly averages]  
Line 187: Line 156:
 
<!--<font color="red"> TBD </font>-->
 
<!--<font color="red"> TBD </font>-->
 
#Verify electron beam quality and establish photon beam (assume 1 day).
 
#Verify electron beam quality and establish photon beam (assume 1 day).
#*<b>Ion Chambers trip threshold must be set using Al. radiators</b>
+
#*<b>Ion Chambers trip threshold must be set using diamond JD70-105 as well as the 4 Al. radiators (1 on goni, 3 on amorphous radiator ladder)</b>
 
#*Tune electron beam with radiator retracted   
 
#*Tune electron beam with radiator retracted   
 
#**<b>Radiator (amorphous and diamond) must be retracted. Collimator should be in blocking position. </b>
 
#**<b>Radiator (amorphous and diamond) must be retracted. Collimator should be in blocking position. </b>
 
#***Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 50 nA)
 
#***Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 50 nA)
 
#****RAD102_P1 <span style="color:#ff00ff">~ 10 mrad/hr</span> (tagger area, gammas, between tagger and dump)
 
#****RAD102_P1 <span style="color:#ff00ff">~ 10 mrad/hr</span> (tagger area, gammas, between tagger and dump)
#****RAD102_P2 <span style="color:#ff00ff">< 0.1 mrad/hr</span> (tagger area, gammas, on the ground below the goniometer).  
+
#****RAD102_P2 <span style="color:#ff00ff">~30 mrad/hr</span> (tagger area, gammas, on the ground below the goniometer).  
 
#****RAD102_P3 <span style="color:#ff00ff">~ 0.3 mrem/hr</span> (tagger area, neutrons, near electronics racks)   
 
#****RAD102_P3 <span style="color:#ff00ff">~ 0.3 mrem/hr</span> (tagger area, neutrons, near electronics racks)   
 
#****RAD508_P1 <span style="color:#ff00ff">< 0.1 mrad/hr</span> (collimator cave, gammas).  
 
#****RAD508_P1 <span style="color:#ff00ff">< 0.1 mrad/hr</span> (collimator cave, gammas).  
Line 201: Line 170:
 
#*** Typical levels are (for 2×10<sup>-5</sup> radiator, electron beam current 50 nA)
 
#*** Typical levels are (for 2×10<sup>-5</sup> radiator, electron beam current 50 nA)
 
#****RAD102_P1= <span style="color:#ff00ff">35  mrad/hr</span> (tagger area, gammas, between tagger and dump)
 
#****RAD102_P1= <span style="color:#ff00ff">35  mrad/hr</span> (tagger area, gammas, between tagger and dump)
#****RAD102_P2= <span style="color:#ff00ff">< 0.5 mrad/hr</span> (tagger area, gammas, on the ground below the goniometer)  
+
#****RAD102_P2= <span style="color:#ff00ff">~ 50 mrad/hr</span> (tagger area, gammas, on the ground below the goniometer)  
 
#****RAD102_P3= <span style="color:#ff00ff"> ~2 mrem/hr</span> (tagger area, neutrons, near electronics racks)
 
#****RAD102_P3= <span style="color:#ff00ff"> ~2 mrem/hr</span> (tagger area, neutrons, near electronics racks)
 
#****RAD508_P1= <span style="color:#ff00ff">~10 mrad/hr</span> (collimator cave, gammas).
 
#****RAD508_P1= <span style="color:#ff00ff">~10 mrad/hr</span> (collimator cave, gammas).
Line 210: Line 179:
 
#**Insert profiler (no need for masking FSD when an object is inserted in the photon line), run with 10×10<sup>-4</sup> radiator and 50 nA. Beam on the profiler should be at x=0.0±0.5cm; y=0.0±0.5cm. If not, inform MCC.
 
#**Insert profiler (no need for masking FSD when an object is inserted in the photon line), run with 10×10<sup>-4</sup> radiator and 50 nA. Beam on the profiler should be at x=0.0±0.5cm; y=0.0±0.5cm. If not, inform MCC.
 
#*Radiation level study (1h):
 
#*Radiation level study (1h):
#**Run 5 min without radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA. Repeat at 100 nA and 200 nA  
+
#**Run 5 min without radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA. Repeat at 100 nA and 200 nA. There is need to run the DAQ or stop the beam between each steps: the data are recorded by EPICS. However, the beam need to be off when moving to a different radiator for the next steps. 
 
#**Run 5 min with the 10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA  
 
#**Run 5 min with the 10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA  
 
#**Run 3 min with the 3*10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA  
 
#**Run 3 min with the 3*10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA  
Line 220: Line 189:
 
#**Until Hovanes determines to optimal 5C11b and Active Collimator position, keep profiler in and beam locked (MCC's duty) on the nominal 5C11b and x=0,y=0 profiler position. Once Active Collimator nominal beam position is known, retract profiler and lock the beam (MCC) on the active collimator.
 
#**Until Hovanes determines to optimal 5C11b and Active Collimator position, keep profiler in and beam locked (MCC's duty) on the nominal 5C11b and x=0,y=0 profiler position. Once Active Collimator nominal beam position is known, retract profiler and lock the beam (MCC) on the active collimator.
 
#Detector and beamline checkout.
 
#Detector and beamline checkout.
#*Reestablish L1 trigger Alex. Somov. 2h).  
+
#*Any time before starting production (beam quality is not important): microscope HV scan (2h, R. Jones) 
 +
#*Reestablish L1 trigger (Alex. Somov. 2h).
 +
#*PS and TAGH HV scan.  (Alex. Somov. 1h).  
 
#*Reestablish DAQ (Sergei, 2h).
 
#*Reestablish DAQ (Sergei, 2h).
#*<strike> TRD DAQ integration (Sergei, 4h). (Fall run)
 
#*PS detector threshold scan.  (A. Somov, 1h) <font color="magenta">Can be done early if necessary: nominal beam quality not mandatory. </font> (Fall run)
 
#*Microscope yield study (row-by-row scan).  (Richard Jones/Jim McIntyre, 1h) <font color="magenta">Can be done early if necessary: nominal beam quality not mandatory. </font>
 
#**Call Richard Jones (860-377-5224) 20 min before the start of this task. Call Alex Somov to set-up the PS trigger.
 
#**Insert 5mm collimator.
 
#**[https://logbooks.jlab.org/entry/3497901 Procedure to follow]
 
#**Any type of beam quality will do.
 
#**10<sup>-4</sup> radiator, 10<sup>-3</sup> convertor, 80 nA beam current. (Fall run) </strike>
 
 
#*General detector calibration (Sean Dobbs. (703-887-1776) 1h). Use 2×10<sup>-5</sup> Al. radiator. Beam current 200nA (Solenoid magnet is off)
 
#*General detector calibration (Sean Dobbs. (703-887-1776) 1h). Use 2×10<sup>-5</sup> Al. radiator. Beam current 200nA (Solenoid magnet is off)
 
#**Run 15 min (solid time) in Long Mode (Mode 10)
 
#**Run 15 min (solid time) in Long Mode (Mode 10)
 
#**Run 15 min (solid time) in Production Mode (Mode 9).
 
#**Run 15 min (solid time) in Production Mode (Mode 9).
#<strike>Straight track trigger configuration (A. Somov, 4h) (Fall run)
+
#[https://halldweb.jlab.org/hdops/wiki/index.php/Summer_2020_CDC_HV_scan_procedure CDC] HV scans (Naomi 6h). Use 4.5×10<sup>-4</sup> Al. radiator (on goni). Beam current  360nA
#Straight track runs with different GEM/TRD positions (Justin, Lubomir, A. Somov, Tim 20h)  (Fall run)
+
#47 μm diamond (Start on JD70-105) alignement check. Later during the run, align new JD70-103 (4 polarization configurations) (Hovanes. 2h ).   
#*Start with first position (beam left position), take 5h of data. 2×10<sup>-5</sup> Al. radiator. Beam current 200nA (Solenoid magnet is off)
+
#GlueX-II pre-production (20h)
#*Request controlled access. Move (Tim et al.) GEM/TRD to beam right position (2h)
+
#*Identical as production below, but at 150 nA. One cycle of five 2h runs on 4 polarization configurations+1 amorphous.  
#*Take 5h of data  2×10<sup>-5</sup> Al. radiator. Beam current 200nA (Solenoid magnet is off)
+
#GlueX-II production
#*Request controlled access. Move (Tim et al.) GEM/TRD to beam center position position and update trigger configuration (2h)
+
#*Standard configuration: 47 μm diamond, 350 nA, 5 mm hole, TPol on 75 μm TPol convertor. 2h runs <b>and no more, as it may be hard to correct for calibration drifts</b>. Cycle over 5 sets of runs: 0<sup>o</sup>, then 90<sup>o</sup>, then 45<sup>o</sup>, then 135<sup>o</sup>, then amorphous runs.  
#*Take 5h of data  2×10<sup>-5</sup> Al. radiator. Beam current 200nA (Solenoid magnet is off)
+
#**Amorphous runs: 4.5×10<sup>-4</sup> Al. radiator (on goni). 350 nA
#Empty {{#tag:math|LH_2}} target (0.5h)  (Fall run)
+
#Ramp-up solenoid (Beni, Tim 8h) and meanwhile, perform tagger accidental measurement (Richard Jones (860-377-5224), 8h)  (Fall run)
+
#*125 nA <I< 2.1 μA. PS trigger only. [https://halldweb.jlab.org/wiki/index.php/Tagger_accidentals_rate_scan,_Fall_2019 detailed tagger accidental measurement plan]
+
#Fill {{#tag:math|LH_2}} target (0.5h)  (Fall run)
+
#[https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2018_CDC_HV_scan_procedure CDC] and [https://halldweb.jlab.org/hdops/wiki/index.php/HV_Scan_Fall_2016 TOF] HV scans (Naomi, Beni, 6h). Use 4.5×10<sup>-4</sup> Al. radiator (on goni). Beam current  140nA  (Fall run)
+
#Start DIRC commissioning with solenoid B-field on and with 4.5×10<sup>-4</sup> Al. radiator (on goni). 140 nA.  (Fall run)
+
#*[https://halldweb.jlab.org/wiki/index.php/Fall_2019_DIRC_Commissioning#Commissioning_Timeline.2C_Tasks_and_Milestones DIRC commissioning page]
+
#47 μm diamond (JD70-105) alignement. (4 polarization configuration) (Hovanes. 16h).  (Fall run)
+
#Continue DIRC commissioning on Al. or diamond radiator  (Fall run)
+
#*[https://halldweb.jlab.org/wiki/index.php/Fall_2019_DIRC_Commissioning#Commissioning_Timeline.2C_Tasks_and_Milestones DIRC commissioning page]  (Fall run)
+
#*Standard configuration: 47 μm diamond, 120-300 nA, 5 mm hole, TPol on (for TPol syst. studies. Not necessary for DIRC)  75 μm TPol convertor. 2h runs <b>and no more, as it may be hard to correct for calibration drifts</b>. Cycle over 5 sets of runs: 0<sup>o</sup>, then 90<sup>o</sup>, then 45<sup>o</sup>, then 135<sup>o</sup>, then amorphous runs.  
+
#**Amorphous runs: 4.5×10<sup>-4</sup> Al. radiator (on goni). 140-360 nA
+
 
#*Log in run information in the shift summary (make a run list). For each production run, log useful comments on DAQ comment window, see [https://halldweb.jlab.org/hdops/wiki/index.php/Best_Practices/FAQ]
 
#*Log in run information in the shift summary (make a run list). For each production run, log useful comments on DAQ comment window, see [https://halldweb.jlab.org/hdops/wiki/index.php/Best_Practices/FAQ]
 
#*Tagger quadrupole on
 
#*Tagger quadrupole on
#*Harp scan (30 min): Everyday.
+
#*Harp scan (30 min): Every 2 days
#*Empty target runs (2h: 1<sup>-</sup> h to empty/fill back the target, 1h running). Standard production current. After RF recovery.
+
#*2 Empty target run (2h: 1<sup>-</sup> h to empty/fill back the target, 1h running). Standard production current. After TAC run, beam study or RF recovery.  
#*Dark current run for ST (and microscope). Long mode 10 min run. At least every fortnight. Beam must be off. Done by Beni on opportunistic basis. 
+
#One "TAC" run + test of new FCal divider.  
#CPP pre-test (David L., 1h). Fall 2019
+
#*Needs to be done with polarized photon  beam.  
+
#One "TAC" run if we have enough time (Hovanes, A. Somov 8h) Fall 2019
+
 
#* a few nA, thinest Al. radiator and ComCal.
 
#* a few nA, thinest Al. radiator and ComCal.
 
#* To be coordinated with MCC.  
 
#* To be coordinated with MCC.  
#* Measure bleedthrough. If acceptable, (~nA or less), proceed with TAC-ComCal run. If not. Consider switching to Hall B slit or running on bleedthrough. </strike>
+
#* Measure bleedthrough. If acceptable, (~nA or less), proceed with TAC-ComCal run. Otherwise, explore possibility for invasive TAC run.
#Gluex data production (Spring 2020)
+
#*<font color="red"> If commissioning and analysis are successful, once a day (?), a beam envelope measurement by rastering on Act. Col. ??min </font>
#*Standard configuration: 47 μm diamond. Choose and maintain the coherent edge to its chosen location. 120-300 nA, 5 mm hole, TPol on  75 μm TPol convertor. 2h runs <b>and no more, as it may be hard to correct for calibration drifts</b>. Cycle over 5 sets of runs: 0<sup>o</sup>, then 90<sup>o</sup>, then 45<sup>o</sup>, then 135<sup>o</sup>, then amorphous runs.  
+
#**Amorphous runs: 4.5×10<sup>-4</sup> Al. radiator (on goni). 140-360 nA
+
#*Log in run information in the shift summary (make a run list). For each production run, log useful comments on DAQ comment window, see [https://halldweb.jlab.org/hdops/wiki/index.php/Best_Practices/FAQ]
+
#*Tagger quadrupole on
+
#*Harp scans once a day: 15 min.
+
#*Dark current run for ST (and BCal and microscope): every fortnight, row mode, sparcification off, no beam (done e.g. during beam study or RF recovery). Beni
+
#*If commissioning and analysis were successful, once a day (?), a beam envelope measurement by rastering on Act. Col. ??min
+
#*Empty target run every 3 week (2h: 1<sup>-</sup> h to empty/fill back the target, 1h running). Standard production current.
+
#Three "TAC" runs (Hovanes, A. Somov 8h)
+
 
#*Long mode 10 min run. Once a week (20 min).
 
#*Long mode 10 min run. Once a week (20 min).
 
#*Amorphous run. Every set of 4 diam. orientation runs. 1h Standard production current. Time to switch from pol. to unpol.: 10min.  time to switch from unpol. to pol.: 30min.
 
#*Amorphous run. Every set of 4 diam. orientation runs. 1h Standard production current. Time to switch from pol. to unpol.: 10min.  time to switch from unpol. to pol.: 30min.
#FCal-BCal-ST trigger test and preparation for high current DAQ tests (A. Somov, 8h) Fall 2019
+
#*Synchronize TAC run with test of new FCal divider (A. Somov).
#Tagger accidental measurement (Richard Jones (860-377-5224), 8h)
+
#Trigger test for the SRC experiment (A. Somov, 6 hours)
#*125 nA <I< 2.1 μA. PS trigger only. [https://halldweb.jlab.org/wiki/index.php/Tagger_accidentals_rate_scan,_Fall_2019 detailed tagger accidental measurement plan]
+
#CPP trigger test (<font color="red">??34h??</font>). (https://halldweb.jlab.org/wiki/index.php/CPP_Test_2020_-_Schedule discussion on tentative plan]) Could be done during pass change for Hall C on Sept. 4th. There will be 2-3 days of running left depending on how smooth the pass change goes. If so, we likely need other tests to use the left beam time (We could do the TAC run then/Empty target run/...?)
#ComCal anode current study (A. Somov, 4h)
+
#<strike> High current DAQ test (Sergei, 4h). 400-600 nA on a 4.5×10<sup>-4</sup> Al radiator (on goni). Fall 2019
+
#High current cDAQ test (Sergei, 4h). 400-600 nA on a 4.5×10<sup>-4</sup> Al radiator (on goni). Fall 2019 </strike>
+
#CPP trigger test (14h)
+
#*Installation (invasive): 6h. Hall openned.
+
#*CPP trigger test (8h). Several access in the Hall to change geometries.
+
#*CPP removal (non-invasive, 8h): once the beam is terminated for the Fall 2019 run (Thursday Dec. 19th, 6am).
+
  
 
== Hall D situation room (current run plan) ==
 
== Hall D situation room (current run plan) ==
Line 293: Line 225:
  
 
== Runplan time charts==
 
== Runplan time charts==
'''Fall 2019 time charts''': (commented out for clarity)
+
'''Summer 2020 time charts''':  
<!--[[File:f19week1.png|70px|thumb|none]]
+
Fall 2019 commissioning/run time chart. Week 1.<br/>
+
The horizontal scale is the time during which beam is available (in other words, it would be the real time with 100% of beam efficiency).<br/>
+
The task time estimates given on the plot have 100% contingency.
+
[[File:f19week2.png|70px|thumb|none|  ]]
+
Run time chart. Week 2.
+
[[File:f19week3.png|70px|thumb|none|  ]]
+
Run time chart. Week 3.
+
-->
+
  
'''Spring 2020 time charts''':
+
[[https://halldweb.jlab.org/wiki/index.php/File:Week1.png Run time chart. Week 1.]]
[[File:S20week1.png|70px|thumb|none]]
+
 
Spring 2020 commissioning/run time chart. Week 1: Jan.8-14 2020.<br/>
+
The horizontal scale is the time during which beam is available (in other words, it would be the real time with 100% of beam efficiency).
The horizontal scale is the time during which beam is available (in other words, it would be the real time with 100% of beam efficiency).<br/>
+
 
The task time estimates given on the plot have 100% contingency.
 
The task time estimates given on the plot have 100% contingency.
[[File:S20week2.png|70px|thumb|none|  ]]
+
 
Run time chart. Week 2: Jan.15-21 2020.
+
[[https://halldweb.jlab.org/wiki/index.php/File:Week2.png Run time chart. Week 2. ]]
[[File:S20week3.png|70px|thumb|none|  ]]
+
 
Run time chart. Week 3: Jan.22-28 2020.
+
[[https://halldweb.jlab.org/wiki/index.php/File:Week3.png Run time chart. Week 3. ]]
[[File:Spr20week4.png|70px|thumb|none|  ]]  
+
 
Run time chart. Week 4: Jan.29-Feb.4 2020.
+
[[https://halldweb.jlab.org/wiki/index.php/File:Week4.png Run time chart. Week 4. ]]
[[File:Spr20week5.png|70px|thumb|none|  ]]
+
 
Run time chart. Week 5: Feb.5-11 2020.
+
[[https://halldweb.jlab.org/wiki/index.php/File:Week5.png Run time chart. Week 5. ]]
[[File:Spr20week6.png|70px|thumb|none|  ]]
+
 
Run time chart. Week 6: Feb.12-18 2020.
+
[[https://halldweb.jlab.org/wiki/index.php/File:Week6.png Run time chart. Week 6. ]]
[[File:Spr20week7.png|70px|thumb|none|  ]]  
+
Run time chart. Week 7: Feb.19-25 2020.
+
[[File:Spr20week8.png|70px|thumb|none|  ]]
+
Run time chart. Week 8: Feb.26-Mar.3 2020.
+
[[File:Spr20week9.png|70px|thumb|none|  ]]
+
Run time chart. Week 9: Mar.4-10 2020.  
+
[[File:Spr20week10.png|70px|thumb|none|  ]]  
+
Run time chart. Week 10: Mar.11-17 2020.
+
[[File:Spr20week11.png|70px|thumb|none|  ]]
+
Run time chart. Week 11: Mar.18-24 2020.
+
[[File:Spr20week12.png|70px|thumb|none|  ]]
+
Run time chart. Week 12: Mar.25-Mar 31 2020.
+
[[File:Spr20week13.png|70px|thumb|none|  ]]  
+
Run time chart. Week 13: Apr.1-7 2020.
+
[[File:Spr20week14.png|70px|thumb|none|  ]]
+
Run time chart. Week 14: Apr.8-14 2020.
+
[[File:Spr20week15.png|70px|thumb|none|  ]]
+
Run time chart. Week 15: Apr.15-21 2020.
+
[[File:Spr20week16.png|70px|thumb|none|  ]]  
+
Run time chart. Week 16: Apr.22-28 2020.
+
[[File:Spr20week17.png|70px|thumb|none|  ]]
+
Run time chart. Week 17: Apr.29-May 6 2020.
+
  
 
<!--*
 
<!--*
Line 350: Line 250:
  
 
==Accelerator status ==
 
==Accelerator status ==
#* [https://cebaf.jlab.org/files/ops/accboard/ Link to accelerator short term schedule]
+
#* [https://cebaf.jlab.org/files/ops/accboard/ Link to accelerator short term schedule (White board)]
 +
#* [https://cebaf.jlab.org/calendar/ Link to accelerator SAD calendar]
 
#* Bluejeans code for the daily MCC meetings and Wednesday 1:30 meeting: 569476853
 
#* Bluejeans code for the daily MCC meetings and Wednesday 1:30 meeting: 569476853
  
 
==Hot Checkout ==
 
==Hot Checkout ==
<span style="color:red">'''To be completed by Thurs. Nov. 22nd.'''  </span>
+
<span style="color:red">'''To be completed by Thurs. July. 23rd.'''  </span>
# [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status]  <span style="color:green"> 100% ready </span>; <span style="color:#BABC3A">0% checked </span>; <span style="color:red">0% not ready  </span>
+
* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status]  ( [https://cebaf.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status (off site test version)])
 +
<span style="color:green"> 100% ready </span>; <span style="color:#BABC3A">0% checked </span>; <span style="color:red">0% not ready  </span>
  
 
==Readiness for Fall 2019/Spring 2020 run ==
 
==Readiness for Fall 2019/Spring 2020 run ==
(This section is commented out for clarity)  
+
(This section is commented out for clarity)
<!--*Solenoid (Eugene/Beni): Ready
+
<!--<strike></strike>
**<strike>Ramped it to 800A.  
+
<strike>*Solenoid (Eugene/Beni):  
**Doing the HCO. To be completed on Nov. 7th.</strike>
+
**Tested ramp-up up to 800A.
*Surveys (Tim/Mark/Scott)
+
**HCO essentially done</strike>
**<strike>Goniometer fiducialization and survey (Oct 18). Done.</strike>
+
*<strike>Surveys (Tim/Mark Stevens/Scott)
**<strike>Target/SC survey (Oct 28)</strike>
+
**No survey needed for this run preparation</strike>
**ComCal final alignment (Nov 20)
+
*<strike>DAQ  (Sergei).
**TAC/Profiler Survey, if possible (Nov 20)
+
**Everything is running well
**<strike>TRD/Gem Fiducialization (Nov 8) and Survey (Nov 12)</strike>
+
**Took cosmic events last week end (July 4th-5th)</strike>
**<strike>DIRC North Final Survey (Nov 13)</strike>
+
*<strike>Trigger (Alex Somov).
**DIRC South Final Survey (Nov 20)
+
**Look fine with cosmic runs and LED run
**FCAL/TOF/ComCal final Survey (Nov 20)
+
**Other trigger types have also been checked.</strike>
**</strike>Tagger Hodoscope Survey: Oct. 31th </strike>
+
**<strike>Collimator Motion</strike>
+
*DAQ  (Sergei).
+
**Ran the DAQ with cosmics and found a few issues. They are fixed and the DAQ looks fine now.
+
**Tested CDAQ as well and a problem was found and fixed.
+
*Trigger (Alex S.).
+
**<strike>Cosmic trigger tested and appears fine.</strike>
+
**<strike>FCal LED trigger is fine too. </strike>
+
**<strike>New firmware being installed on FCAL and BCal crates.</strike>
+
**Further checks ongoing.
+
**PS trigger has now a separate trigger type.
+
***<strike>Problem found for 5 FCal Boards. They have been replaced.</strike>
+
 
*Beam line  
 
*Beam line  
 
**<strike>Diamond status (Tim/Hovanes).  
 
**<strike>Diamond status (Tim/Hovanes).  
***Diamonds are ready.</strike>
+
***No change needed since last run.</strike>
**Tagger hodoscope (A. Somov).  
+
**<strike>Tagger hodoscope (A. Somov).  
***Checked and ready for HCO
+
**Turned on and be tested. It's ready</strike>
***One counter was broken recently. It is fixed now.
+
**Tagger microscope (R. Jones/Beni).
**Tagger microscope (Richard Jones/Beni).
+
***Beni turned it on (July 6th).
***Temperature readout to be added to EPICS in order to enable temperature alarms.  
+
***Richard will check dark rates and the do the HCO.  
 
**<strike>Goniometer (Hovanes).
 
**<strike>Goniometer (Hovanes).
***Tested during survey. Everything was fine. </strike>
+
***Was tested this week (July 13th-18th) and works fine.  
**<strike>Collimator Motion (Hovanes).</strike>
+
**Collimator Motion (Hovanes).
**<strike>Active collimator detectors(Richard Jones/Alexandre Deur)</strike>
+
***Motion was tested this week (13th-18th) and works fine. </strike>
**Profiler (Hovanes)
+
** <strike>Active collimator detectors(R. Jones/A. Deur)
***Could not boot the controller.
+
***HCO done
 +
***N. Sandoval installed insulators to ground connections.
 +
***Richard reported that waveforms do not update on Monticello. This is now fixed.  </strike>
 +
**<strike>Profiler (Hovanes)
 +
***Looks good.</strike>
 
**Luminosity monitor (aka Active Target) (Hovanes).
 
**Luminosity monitor (aka Active Target) (Hovanes).
***To be installed behind ComCal.
+
***Mounted. Test and HCO needed
**Halo monitors (Hovanes)
+
** <strike>Halo monitors (Hovanes)
***Need to put the halo monitors near the target, once the area become less busy (Nov. 18-23rd).
+
***Mounted and ready  </strike>
**PS system (Alex Somov)  
+
**<strike>PS system (Alex Somov)  
***Suspicious channel. Not a critical problem. Looking at it with Fernando.  
+
***Was turned on and looks fine.
***Ready for HCO
+
***Tim checked the PS magnet (also 2nd collimator sweeping magnet). They ramped-up fine. </strike>
**Need to integrate the standalone GEM/TRD crate into trigger/DAQ.
+
** <strike>Polarimeter (M. Dugger/Beni/Fernando).
***<strike>Necessary for DIRC commissioning. </strike>
+
***Beni turned it on. It looks all fine (The voltage warning Beni reported on turned out to be a permanent feature).</strike>
***To be done this week.
+
**<strike>LH2 Target (Tim/A Deur)  
***<strike>Involves Fernando, A. Somov and Sergei.
+
***C. Keith checked  and prep it. All look fine.</strike>
***Calorimeter and aerogel detectors to be tested in PS area need to be integrated as well. However, they are not part of the main goal of this run. </strike>
+
**<strike>TAC (Hovanes/Alex Somov).
**<strike>Polarimeter (M. Dugger/Beni/Fernando).  
+
***Won't be use for TAC run for this run, but will be used for fiber tests</strike>
***Tested early Oct. when M. Dugger was on site. It looks fine and operational.</strike>
+
**LH2 Target (Tim/Alexandre D.)  
+
***Installed and surveyed.
+
***HCO to be completed on Nov. 21st.
+
**TAC (Hovanes/Alex Somov).
+
***<strike>New divider installed. TAC signals look fine now. </strike>
+
***TAC is now installed and ready to be surveyed.
+
 
**Slow control (Hovanes).  
 
**Slow control (Hovanes).  
***<strike>Added DIRC and TOF new channels.</strike>
+
***Need to be checked (typically done at the end of HCO). A few devices display communication problems (target, PS magnet, Act. Col.)
**RF (Sergei)
+
**<strike>RF (Sergei)
***Checked, appart for the TOF signal: one cable need to be reconnected.
+
***Checked and ready</strike>
**Radiation monitors (Alexandre D.)
+
**<strike>Radiation monitors (A. Deur)
***They are all in place. Signals from tagger vault look fine. No signal from the hall. John Jefferson looking into it.
+
***Checked this morning (July 13th). All look good (102_p1, 102_p2, 102_p3, 508_P1 and 508_P2)</strike>
**<strike>x-ray W shield (Tim/Lubomir).</strike>
+
**<strike>x-ray W shield (Tim/Lubomir).
 +
No change. Ready.</strike>
 
*Detector systems
 
*Detector systems
**ST (Mark Ito/Beni): Ready
+
**<strike>ST (Mark Ito/Beni)
***<strike> Up and running. HCO done. </strike>
+
***It was turned on and it looks fine</strike>
**<strike>FDC (Lubomir).
+
** <strike>FDC (Lubomir).
***Defective low voltages have been replaced. FDC look fine now.
+
***It was turned on and it looks fine. However, Lubomir rechecked it after alcohol is put in the gas system. </strike>
***A protective mesh has been installed
+
***Few more checks to be done for gas. HCO done.</strike>
+
 
**<strike>CDC (Beni).
 
**<strike>CDC (Beni).
***Tests completed and the CDC ready. Now the target can be moved in.
+
***It was turned on and it looks fine</strike>
***Taking cosmic in raw mode. This revealed a few suspicious channels. We will live with that.
+
***2 preamps replaced.
+
***Drift times are longer with new alcohol. See [https://logbooks.jlab.org/entry/3737619 Naomi's report].
+
****Not clear that this is a problem: it will be studied with CDC HV scan at the start of the run.
+
****A few options are possible to bring back the drift time to about former values.
+
***HCO done</strike>
+
 
**<strike>Gas system (Beni/Lubomir)
 
**<strike>Gas system (Beni/Lubomir)
***Gas chromatograph is now installed for the CDC. It can be remotely switch to looked at the FDC and TRD instead.
+
***It was turned on and it looks fine</strike>
***HCO done</strike>
+
 
**<strike>BCal (Elton/Mark Dalton)  
 
**<strike>BCal (Elton/Mark Dalton)  
***Was turned on. Some of the low voltages did not come up but this is fixed now.
+
***It was turned on and it looks fine.  
***Taking cosmic data. Things look fine so far.  
+
***Was cool down to 5° (nominal operation temperature).</strike>
***New firmware installed.
+
**FCal (Mark Dalton/Colin Gleason)  
***Chiller was installed.
+
***It was turned on
***HCO done.</strike>
+
***10  bad channels were identified.
**FCal (Collin Gleason)  
+
***LED data to be taken.
***15 basis left to be replaced. Will be done by thanksgiving.
+
** <strike>ComCal (in lieu of TAC) (Alex Somov).
****Collin will replace 3 bases and check 30 spares.
+
***checked and ready. </strike>
***<strike>5 broken boards were  replaced.</strike>
+
** <strike>TOF (Mark Ito/Beni).
**ComCal (in lieu of TAC) (Alex Somov).
+
***Cosmic data showed anomalous ADC module behavior (bad timing). It is now fixed.
***Installed. Will be surveyed on 20th.
+
***3 PMT signals  have lower amplitude, but they still seem to be ok.</strike>
**TOF (Mark Ito/Beni).
+
**<strike>DIRC (J. Stevens).
***Due to the TOF upgrade, all the frames were removed. TOF is now re-cabled but still needs to be checked.  
+
***Was inspected last week (July 7th). Restored light tightness.
***<strike>TOF was surveyed and showed offsets.
+
***Tested with DAQ and everything looks fine.</strike>
***HV translation table done. Spreadsheet updated.</strike>
+
**DIRC (J. Stevens).
+
***<strike>Readout: the detectors are cabled and successfully read in pulser mode. One PMT was bad but has now been fixed. </strike>
+
***<strike>Mirror boxes: got the borosilicate glass that insulates the mirrors from the water. </strike>
+
***North box ready. It has a small water leak but we will live with it.
+
***South box is ready. It also has a small water leak with which will live. 
+
***The boxes are installed and filled with water. The bars are darkened. Everything is now ready to be checked.
+
 
**<strike>GEM/TRD (Sergei/Lubomir).
 
**<strike>GEM/TRD (Sergei/Lubomir).
***ready</strike>
+
***In place and ready</strike>
**Monitoring (Alexander Austregesilo/David L.)
+
**<strike>Monitoring (Alexander Austregesilo)
***RCDB will start Fall2019/Spring 2020 runs at 70,000.
+
***Running fine without any problem.</strike>
 
*RSAD and ESAD Safety documents (Beni):  
 
*RSAD and ESAD Safety documents (Beni):  
**All documents are ready in time. Certificate to run has been signed.  
+
**<strike>All safety documentation is ready.</strike>
**Task lists and OPS to be written for the stand-alone tests in the PS area. None needed for the Regina profiler fiber test.
+
**[https://www.jlab.org/Hall-D/hd_safety.php Hall D safety and training pages, with COVID-19 training requirement]
 +
**[https://www.jlab.org/memo/medcon-5-transition-updates MedCon5 page]
 +
**[https://www.jlab.org/memo/medcon-5-employeeuser-training-requirements JLab page giving staff and user COVID-19 training requirement]
 
*Phones  
 
*Phones  
**<font color="red">System experts should start looking for their phone and charger.</font>  
+
<!--**<font color="red">System experts should start looking for their phone and charger.</font>  
 
**<font color="red">System experts should have found their on-call phones by now and should start charging them.</font>  
 
**<font color="red">System experts should have found their on-call phones by now and should start charging them.</font>  
**<font color="red">System experts should start carrying their (charged) phone.</font>  
+
**<font color="red">System experts should start carrying their (charged) phone.</font> -->
*Hall Status/safety (Mark/Tim/Scott)
+
<!--*Hall Status/safety (Mark/Tim/Scott)
*Other topics?-->
+
*Other topics? -->
  
 
== Live Camera Feeds from the Four Counting Houses ==
 
== Live Camera Feeds from the Four Counting Houses ==
Line 482: Line 356:
 
# Management cautions AGAINST opening them from other locations or offsite, out of concern for available bandwidth.
 
# Management cautions AGAINST opening them from other locations or offsite, out of concern for available bandwidth.
  
::* [https://physdiv.jlab.org/CountingHouses/# Live video feeds to four counting houses]
+
== Running Shifts Remote ==
 +
* [[Remote shift concepts]]
 +
<!--::* [https://physdiv.jlab.org/CountingHouses/# Live video feeds to four counting houses]-->

Latest revision as of 08:01, 11 January 2022

Summer 2020 GlueX Run

Run Statistics Google Spreadsheet.

Meeting General Agenda

Run Planning Meeting Notes, July 27-August 5, 2020

Run Planning Meeting Notes, August 6 - 12, 2020

Run Planning Meeting Notes, August 13 -17, 2020

Run Planning Meeting Notes, August 20-26, 2020

Run Planning Meeting Notes, August 27-September 2, 2020

Run Planning Meeting Notes, September 3 - 9, 2020

Run Planning Meeting Notes, September 10 - 16, 2020

Run Planning Meeting Notes, September 17 - 21, 2020

Connect Information

To connect from the outside by phone please do the following

1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.

2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.

3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.

4.) The moderator code is 8394

Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Specific instructions for connecting from JLab's Hall D conference room:

  • Turn polycon on if necessary (do it before turning the computer on)
  • With the polycon, place a call at 199.48.152.152
  • Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
  • You may have to unmute the microphone: #*4
  • Turn the computer on if needed

Beam and Hall configuration

  • Beam energy expected:
    • 11.408 GeV (i.e. about 200 MeV less than value for Spring 2019)
  • Solenoid:
    • 1350A
  • CW Beam:
    • 250 MHz frequency.
    • Range: 1 nA-900
    • Chopper slit: With Hall C until Sept. 3rd (always at 5 passes). Then, with Hall A (Hall A: one pass always until Sept. 3rd. Then off.) Note: Hall B at 1 pass for the first 4 days, then, at 5 pass until the end of the run.
    • Standard current and radiators
      • ~350 nA on a 4.1·10-4 R.L. radiator (50 μm diamond). (RSAD limit 500nA on 58 μm diamond))
      • ~350 nA on a 33.7·10-5 R.L. AL radiator (30 µm Al). (RSAD limit 600nA on 30 µm Al radiator))
  • Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).
  • Radiators:
    • Goniometer radiators:
      • Diamond JD70-103 (50 μm - 4.1·10-4 R.L., 7×7 mm²) - new crystal - Not expected to be good according to rocking curve.
      • Diamond JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) - Used for the second part of GlueX's Fall 2018 run and Fall 2019/Spring 2020. Good performance.
      • Diamond JD70-106 (50 μm - 4.1·10-4 R.L., 7×7 mm²) - Aligned and used shortly during Tagger Accidental test in Spring 2020. Did not display sharp coherent peak.
      • Diamond JD70-107 (55 μm - 4.6·10-4 R.L., 7×7 mm²) - new crystal - Not expected to be good according to rocking curve.
      • Diamond JD70-109 (50 μm - 4.1·10-4 R.L., 7×7 mm²) - new crystal - Not expected to be good according to rocking curve.
      • Amorphous 40 μm Al radiator (44.9·10-5 R.L.)
      • V-wire (for TAC run).
    • Amorphous
      • 1.64 µm Al (1.86·10-5 R.L., see study)
      • 10 µm Al (11.2·10-5 R.L.)
      • 30 µm Al (33.7·10-5 R.L.)
  • Tagger quadrupole on (-4.2 A).
  • Collimator hole: Default running: 5.0 mm.
  • PS converter: 75 μm
  • Miscellaneous:
    • PS test area:
      • Left arm: TRD and 12 calorimeter crystals to be tested
      • Right arm: scintillator calorimeter to be tested
    • DIRC installed.
    • Other?

General Information

This document describes the run plan for the Hall D Summer 2020 run.

  1. July 13th - July 26th: Electron beam restoration.
  2. July 27th - Sept.6th: 6 weeks for GlueX high luminosity production.


  • Accelerator overall plan and priorities: Finish Spring run 2020 cut short by pandemic.
    • Deliver physics beam to 4 halls.
  • Hall D plan
    • Experiment: GlueX-II E12-12-002
    • This run period is short (6 weeks). To make the acquired data set worth analyzing: maximize production, do only crucial tests.
    • One TAC runs synchronized with test of new FCal divider.
    • Two empty target runs (One at the start of the run, the other consecutive to TAC run)
    • Trigger test for the SRC experiment
    • CPP trigger test.
  • Expected Staffing and responsibilities:
    • The Run Coordinator oversees the run:
      • July 13th-July 26th: 14 days: Alexandre Deur (accelerator restoration)
      • July 27th-Aug. 5th, 10 days: Alexandre Deur
      • Aug 5th-Aug 12th, 7 days: Alexander Austregesilo
      • Aug 12th-Aug 19th, 7 days: Wenliang Li
      • Aug 19th-Aug 26th, 7 days: Mark-Macrae Dalton
      • Aug 26th-Sept. 2nd, 7 days: Igal Jaegle
      • Sept 2nd-Sept 9th, 7 days: Keigo Mizutani
      • Sept 9th-Sept 16th, 7 days: Alexandre Deur
      • Sept 16th-Sept 21st, 5 days: Igal Jaegle

Runplan

  1. Verify electron beam quality and establish photon beam (assume 1 day).
    • Ion Chambers trip threshold must be set using diamond JD70-105 as well as the 4 Al. radiators (1 on goni, 3 on amorphous radiator ladder)
    • Tune electron beam with radiator retracted
      • Radiator (amorphous and diamond) must be retracted. Collimator should be in blocking position.
        • Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 50 nA)
          • RAD102_P1 ~ 10 mrad/hr (tagger area, gammas, between tagger and dump)
          • RAD102_P2 ~30 mrad/hr (tagger area, gammas, on the ground below the goniometer).
          • RAD102_P3 ~ 0.3 mrem/hr (tagger area, neutrons, near electronics racks)
          • RAD508_P1 < 0.1 mrad/hr (collimator cave, gammas).
          • RAD508_P2 ~ 0. mrad/hr (Hall. Neutrons).
    • Establish good photon beam
    • Make sure tagger quadrupole is on and at -4.2 A. (It can be turned on only once the Hall is in power/beam permit.)
      • Insert 2*10-5 RL radiator. Call MCC and ask to mask the FSD and turn off beam each time a radiator is moved
        • Typical levels are (for 2×10-5 radiator, electron beam current 50 nA)
          • RAD102_P1= 35 mrad/hr (tagger area, gammas, between tagger and dump)
          • RAD102_P2= ~ 50 mrad/hr (tagger area, gammas, on the ground below the goniometer)
          • RAD102_P3= ~2 mrem/hr (tagger area, neutrons, near electronics racks)
          • RAD508_P1= ~10 mrad/hr (collimator cave, gammas).
          • RAD508_P2 < ~ 0. mrad/hr (Hall. Neutrons).
    • Verify beam position and envelope (Hovanes).
      • Ask MCC to set beam position on 5C11b to x=-0.5 mm and y=+1.0 mm.
      • Ask MCC for 5C11 and 5C11B HARP. Then do our radiator HARP scan, see instruction. If it looks good, proceed to next step. Otherwise, inform MCC.
      • Insert profiler (no need for masking FSD when an object is inserted in the photon line), run with 10×10-4 radiator and 50 nA. Beam on the profiler should be at x=0.0±0.5cm; y=0.0±0.5cm. If not, inform MCC.
    • Radiation level study (1h):
      • Run 5 min without radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA. Repeat at 100 nA and 200 nA. There is need to run the DAQ or stop the beam between each steps: the data are recorded by EPICS. However, the beam need to be off when moving to a different radiator for the next steps.
      • Run 5 min with the 10-4 radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
      • Run 3 min with the 3*10-4 radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
    • Photon flux optimization and Active Collimator calibration. (20 + 20 mins). Call Hovanes.
      • re-Insert the 10-4 radiator (Call MCC). Use about 100 nA beam current. This will provide the Act. Col. nominal positions for its high gain values.
      • Determine maximum photon beam transmission by doing 2D scans using the collimator x/y motions (Hovanes. 1h)
      • Repeat procedure with 2*10-5 radiator (Call MCC) and 50 nA beam current. This will provide the Act. Col. nominal positions for its low gain values.
      • Record on the white board what is the beam position on 5C11b and Active Collimator for optimal photon transmission, both for low and high Act. Col. gain.
      • Until Hovanes determines to optimal 5C11b and Active Collimator position, keep profiler in and beam locked (MCC's duty) on the nominal 5C11b and x=0,y=0 profiler position. Once Active Collimator nominal beam position is known, retract profiler and lock the beam (MCC) on the active collimator.
  2. Detector and beamline checkout.
    • Any time before starting production (beam quality is not important): microscope HV scan (2h, R. Jones)
    • Reestablish L1 trigger (Alex. Somov. 2h).
    • PS and TAGH HV scan. (Alex. Somov. 1h).
    • Reestablish DAQ (Sergei, 2h).
    • General detector calibration (Sean Dobbs. (703-887-1776) 1h). Use 2×10-5 Al. radiator. Beam current 200nA (Solenoid magnet is off)
      • Run 15 min (solid time) in Long Mode (Mode 10)
      • Run 15 min (solid time) in Production Mode (Mode 9).
  3. CDC HV scans (Naomi 6h). Use 4.5×10-4 Al. radiator (on goni). Beam current 360nA
  4. 47 μm diamond (Start on JD70-105) alignement check. Later during the run, align new JD70-103 (4 polarization configurations) (Hovanes. 2h ).
  5. GlueX-II pre-production (20h)
    • Identical as production below, but at 150 nA. One cycle of five 2h runs on 4 polarization configurations+1 amorphous.
  6. GlueX-II production
    • Standard configuration: 47 μm diamond, 350 nA, 5 mm hole, TPol on 75 μm TPol convertor. 2h runs and no more, as it may be hard to correct for calibration drifts. Cycle over 5 sets of runs: 0o, then 90o, then 45o, then 135o, then amorphous runs.
      • Amorphous runs: 4.5×10-4 Al. radiator (on goni). 350 nA
    • Log in run information in the shift summary (make a run list). For each production run, log useful comments on DAQ comment window, see [2]
    • Tagger quadrupole on
    • Harp scan (30 min): Every 2 days
    • 2 Empty target run (2h: 1- h to empty/fill back the target, 1h running). Standard production current. After TAC run, beam study or RF recovery.
  7. One "TAC" run + test of new FCal divider.
    • a few nA, thinest Al. radiator and ComCal.
    • To be coordinated with MCC.
    • Measure bleedthrough. If acceptable, (~nA or less), proceed with TAC-ComCal run. Otherwise, explore possibility for invasive TAC run.
    • If commissioning and analysis are successful, once a day (?), a beam envelope measurement by rastering on Act. Col. ??min
    • Long mode 10 min run. Once a week (20 min).
    • Amorphous run. Every set of 4 diam. orientation runs. 1h Standard production current. Time to switch from pol. to unpol.: 10min. time to switch from unpol. to pol.: 30min.
    • Synchronize TAC run with test of new FCal divider (A. Somov).
  8. Trigger test for the SRC experiment (A. Somov, 6 hours)
  9. CPP trigger test (??34h??). (https://halldweb.jlab.org/wiki/index.php/CPP_Test_2020_-_Schedule discussion on tentative plan]) Could be done during pass change for Hall C on Sept. 4th. There will be 2-3 days of running left depending on how smooth the pass change goes. If so, we likely need other tests to use the left beam time (We could do the TAC run then/Empty target run/...?)

Hall D situation room (current run plan)

Hall D counting room white board


Runplan time charts

Summer 2020 time charts:

[Run time chart. Week 1.]

The horizontal scale is the time during which beam is available (in other words, it would be the real time with 100% of beam efficiency). The task time estimates given on the plot have 100% contingency.

[Run time chart. Week 2. ]

[Run time chart. Week 3. ]

[Run time chart. Week 4. ]

[Run time chart. Week 5. ]

[Run time chart. Week 6. ]


Accelerator status

Hot Checkout

To be completed by Thurs. July. 23rd.

100% ready ; 0% checked ; 0% not ready

Readiness for Fall 2019/Spring 2020 run

(This section is commented out for clarity)

Live Camera Feeds from the Four Counting Houses

  1. These feeds SHOULD be open and visible at all times from one of the monitors in each of the counting houses.
  2. Management cautions AGAINST opening them from other locations or offsite, out of concern for available bandwidth.

Running Shifts Remote