Difference between revisions of "Run Coordination Meetings: Fall 2015 Run"

From GlueXWiki
Jump to: navigation, search
(Meeting General Agenda)
(Meeting General Agenda)
Line 54: Line 54:
 
#*<span style="color:blue">Microscope</span> Ready but need to do HCO.
 
#*<span style="color:blue">Microscope</span> Ready but need to do HCO.
 
#*<span style="color:blue">Hodoscope checks</span>  
 
#*<span style="color:blue">Hodoscope checks</span>  
#*<span style="color:blue"><strike> Active Collimator <strike>- </span> Placed on the 5mm hole.
+
#*<span style="color:blue"><strike> Active Collimator </strike>- </span> Placed on the 5mm hole.
 
#*<span style="color:blue"> <strike>Collimator</strike> </span> On blocking position.
 
#*<span style="color:blue"> <strike>Collimator</strike> </span> On blocking position.
#*<span style="color:blue"> Profiler/<strike>intensity monitor<strike> - </span> Profiler has been updated for faster acquisition. It working but a few checks remain.
+
#*<span style="color:blue"> Profiler/<strike>intensity monitor</strike> - </span> Profiler has been updated for faster acquisition. It working but a few checks remain.
#*<span style="color:blue"> Pair spectrometer</span> Will be tested today.
+
#*<span style="color:blue"> Pair spectrometer.</span> Will be tested today.
 
#*<span style="color:blue"><strike>Target</strike></span> Empty (i.e with H2 gas). A 1 cm plastic disk is in position at the end of the ST.
 
#*<span style="color:blue"><strike>Target</strike></span> Empty (i.e with H2 gas). A 1 cm plastic disk is in position at the end of the ST.
#*<span style="color:blue"><strike> Start Counter <strike> </span> There are 3 dead channels (most likely accidentally unplugged during ST motion). They will not be fixed since techs are busy with the solenoid and the ST will not be very useful for this run (target foil outside of the ST).
+
#*<span style="color:blue"><strike> Start Counter </strike> </span> There are 3 dead channels (most likely accidentally unplugged during ST motion). They will not be fixed since techs are busy with the solenoid and the ST will not be very useful for this run (target foil outside of the ST).
 
#*<span style="color:blue"><strike>FDC </strike></span>  
 
#*<span style="color:blue"><strike>FDC </strike></span>  
 
#*<span style="color:blue"><strike>FCal</strike></span>
 
#*<span style="color:blue"><strike>FCal</strike></span>
#*<span style="color:blue"><strike>CDC<strike></span> One low voltage channel has its current readout dropping to zero and then coming back up. Some other channels display this sometimes too.   
+
#*<span style="color:blue"><strike>CDC</strike></span> One low voltage channel has its current readout dropping to zero and then coming back up. Some other channels display this sometimes too.   
 
#*<span style="color:blue"><strike>TOF</strike></span>
 
#*<span style="color:blue"><strike>TOF</strike></span>
#*<span style="color:blue"><strike>Transmission radiation detector<strike></span>
+
#*<span style="color:blue"><strike>Transmission radiation detector</strike></span>
#*<span style="color:blue">Slow controls</span> Mostly done. There are a couple of remaining things to do.  
+
#*<span style="color:blue">Slow controls.</span> Mostly done. There are a couple of remaining things to do.  
 
#*<span style="color:blue"><strike>DAQ</strike></span>
 
#*<span style="color:blue"><strike>DAQ</strike></span>
#*<span style="color:blue"><strike>Trigger<strike></span> integrating the tagger crates in the trigger.  
+
#*<span style="color:blue"><strike>Trigger</strike></span> integrating the tagger crates in the trigger.  
 
#*<span style="color:blue"><strike>Online monitoring</strike></span>
 
#*<span style="color:blue"><strike>Online monitoring</strike></span>
#* <span style="color:blue">Tagger magnet, PS magnet, <strike>2nd sweep magnet.<strike></span> NMR for tagger magnet is not working.
+
#* <span style="color:blue">Tagger magnet, PS magnet, <strike>2nd sweep magnet.</strike></span> NMR for tagger magnet is not working.
 
#* <span style="color:blue"><strike>Goniometer</strike>
 
#* <span style="color:blue"><strike>Goniometer</strike>
 
#* <span style="color:blue"><strike>Polarimeter</strike> (converter is out of the way)
 
#* <span style="color:blue"><strike>Polarimeter</strike> (converter is out of the way)

Revision as of 08:37, 8 December 2015

General information

Weekly Meetings, TBD, Hall D conference room. Held by the Run Coordinator. Present Run Coordinator: David Lawrence (Alexandre Deur returns after Thanksgiving)

Connect Information

To connect from the outside by phone please do the following

1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.

2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.

3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.

4.) The moderator code is 8394

Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

4.) More information on connecting to bluejeans is available. The old ESNET and SeeVough Information is archived here.

Specific instructions for connecting from JLab's Hall D conference room:

  • Turn polycom on if necessary (do it before turning the computer on)
  • With the polycom, place a call at 199.48.152.152
  • Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
  • You may have to unmute the microphone: #*4
  • Turn the computer on if needed

Meeting General Agenda

Minutes of the September 22, 2015 meeting.

Minutes of the October 02, 2015 meeting.

Minutes of the October 24, 2015 meeting.

Minutes of the Dec. 1st, 2015 meeting.

Dec. 3rd 2015 meeting

  1. Report relevant updates from 7:50 and 8:00 daily MCC meetings:
    • Accelerator has steered beam through ARC6 (3 passes) by end of owl shift last night. 1090MeV per linac (=6.6GeV)
    • Machine tuning is continuing. There is a problem for a power supply in ARC 9 (faulty choke). Accelerator will switch with choke from ARC 10 in order to gain time and enable the delivery of beam with max. energy to Hall A.
    • Beam to Hall D is postponed to Dec. 8th.
    • Link to accelerator short term schedule
    • Accelerator schedule through June 2017.
  2. Hot Check OUT Status 54% ready ; 3% checked ; 43% not ready
  3. Report on Work in the Hall:
    • Solenoid: Wrapping up repairs. Then, the cool down will begin. During this cool down, there will be times when control or restricted accesses will be needed (disruptions for MCC since any access for us bring down the gun).
    • Surveys
    • Amorphous Radiators
    • Radiation monitors Status of shielding?
    • Halo Counters : The one on the platform has been be put back. Others are good but there is a question regarding their alignment (orientation).
    • Microscope Ready but need to do HCO.
    • Hodoscope checks
    • Active Collimator - Placed on the 5mm hole.
    • Collimator On blocking position.
    • Profiler/intensity monitor - Profiler has been updated for faster acquisition. It working but a few checks remain.
    • Pair spectrometer. Will be tested today.
    • Target Empty (i.e with H2 gas). A 1 cm plastic disk is in position at the end of the ST.
    • Start Counter There are 3 dead channels (most likely accidentally unplugged during ST motion). They will not be fixed since techs are busy with the solenoid and the ST will not be very useful for this run (target foil outside of the ST).
    • FDC
    • FCal
    • CDC One low voltage channel has its current readout dropping to zero and then coming back up. Some other channels display this sometimes too.
    • TOF
    • Transmission radiation detector
    • Slow controls. Mostly done. There are a couple of remaining things to do.
    • DAQ
    • Trigger integrating the tagger crates in the trigger.
    • Online monitoring
    • Tagger magnet, PS magnet, 2nd sweep magnet. NMR for tagger magnet is not working.
    • Goniometer
    • Polarimeter (converter is out of the way)
    • TAC
    • If you have work to do in the Hall, please notify Tom (Hall work coordinator) and if necessary, document it in the electronic logbook.
    • OSL need to be worn everywhere in Hall D.
  4. Fall 2015 Commissioning Plan