Difference between revisions of "Run Coordination Meetings: Fall 2015 Run"

From GlueXWiki
Jump to: navigation, search
Line 46: Line 46:
 
#*If you have work to do in the Hall, please notify Tom (Hall work coordinator) and if necessary, document it in the electronic logbook.
 
#*If you have work to do in the Hall, please notify Tom (Hall work coordinator) and if necessary, document it in the electronic logbook.
 
#*OSL need to be worn everywhere in Hall D.
 
#*OSL need to be worn everywhere in Hall D.
 +
#[[Fall 2015 Commissioning Plan]]

Revision as of 08:47, 17 November 2015

General information

Weekly Meetings, TBD, Hall D conference room. Held by the Run Coordinator. Present Run Coordinator: David Lawrence (Alexandre Deur returns after Thanksgiving)

Connect Information

To connect from the outside by phone please do the following

1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.

2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.

3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.

4.) The moderator code is 8394

Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

4.) More information on connecting to bluejeans is available. The old ESNET and SeeVough Information is archived here.

Specific instructions for connecting from JLab's Hall D conference room:

  • Turn polycom on if necessary (do it before turning the computer on)
  • With the polycom, place a call at 199.48.152.152
  • Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
  • You may have to unmute the microphone: #*4
  • Turn the computer on if needed

Meeting General Agenda

Minutes of the September 22, 2015 meeting.

Minutes of the October 02, 2015 meeting.

Nov. 17th 2015 meeting

  1. Report relevant updates from 7:50 and 8:00 daily MCC meetings:
    • Accelerator plan to start circulating 12 GeV beam in the machine on Nov. 20th. Thanksgiving is still on Standby for accelerator OPS.
    • Beam to Hall D is planned for Dec. 4th. It will start with beam in the tagger only for fast feedback commissioning.
      • Beam is in the machine, up to 1R (first recombiner, just after East Arc).
      • Problem with CHL seems fixed (the origin of the problem seems to have been to tight cable). South linac is cooled down. It seems there is a cryogen leak in a waveguide for cavity 2L12 due to a leaky window. The zone is now bypassed and warmed up for repair.
    • Link to accelerator short term schedule
    • Accelerator schedule up to 09/30/2016.
  2. Hot Check OUT Status 10.2% ready ; 0% checked ; 89.8% not ready
  3. Report on Work in the Hall:
    • If you have work to do in the Hall, please notify Tom (Hall work coordinator) and if necessary, document it in the electronic logbook.
    • OSL need to be worn everywhere in Hall D.
  4. Fall 2015 Commissioning Plan